Inspections for the day of: Monday, March 3, 2003.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02392 BLD-Energy code compliance2/28/20033/3/20033/3/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 2/28/2003 at 1:01:10 PM. Contact: ###-####.
BLD02-02511 BLD-Energy code compliance3/3/20033/3/20033/3/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 3/3/2003 at 6:51:45 AM. Contact: ###-####.
BLD03-00190 BLD-Framing/Rough-in2/28/20033/3/20033/3/2003 12:00:00 AMAFAIL
###-#### C/N NR, Need appr plan, P.T. post. 3/3/2003 11:10:23 AM
BLD02-01968 BLD-Final2/28/20033/3/20033/3/2003 12:00:00 AMAPASS
###-#### C/C issued. 3/3/2003 10:18:54 AM
BLD02-01923 BLD-Framing/Rough-in2/28/20033/3/20033/3/2003 12:00:00 AMPPART
JOHN; Phone #: ###-#### Internet Inspection Request from: Darla Downs Shear OK (EXT.) on East 1/2 of bldg. (int. shear at front wall....later). 3/3/2003 2:20:31 PM
BLD03-00272 BLD-Footing3/3/20033/3/20033/3/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/3/2003 at 7:40:43 AM. Contact: ###-####.
BLD03-00347 BLD-Footing3/3/20033/3/20033/3/2003 12:00:00 AMPPART
###-#### dane
BLD02-02138 BLD-Conference3/3/20033/3/20033/3/2003 12:00:00 AMPPASS
gary; Phone #: ###-#### Internet Inspection Request from: Darla Downs Work in Progress. 3/3/2003 1:54:46 PM
BLD02-02392 BLD-Energy code compliance3/3/20033/3/20033/3/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/3/2003 at 10:08:57 AM. Contact: ###-####.
BLD03-00345 BLD-Framing/Rough-in3/3/20033/3/20033/3/2003 12:00:00 AMPPASS
wayne rebar inspection; Phone #: ###-#### Internet Inspection Request from: Darla Downs Pool Rebar OK. 3/3/2003 1:54:15 PM