BLD03-03009
| FIRE-Conference | 3/2/2004 | 3/3/2004 | 3/3/2004 12:00:00 AM | A | DONE |
|
|
spoke to the contractor about life safety requirements in the new tenant space 3/3/2004 9:21:55 AM
|
FIR04-00037
| INSP-Sprinkler Rough-in/Hydro | 3/2/2004 | 3/3/2004 | 3/3/2004 12:00:00 AM | A | PART |
|
|
areas FR1-9, FR1-1 and FR2-2 are complete 3/3/2004 9:23:19 AM
|
FIR04-00140
| INSP-Final Inspection | 3/2/2004 | 3/3/2004 | 3/3/2004 12:00:00 AM | A | PASS |
|
|
hood suppression system operated correctly 3/3/2004 11:24:28 AM
|
FIR03-00586
| INSP-Conference | 3/3/2004 | 3/3/2004 | 3/3/2004 12:00:00 AM | A | DONE |
|
|
At Mary's request I stopped at this project to verify if smoke detectors are installed and if possible the reason they are installed. I found smoke detectors installed on the left hand side of the lobby at three fire doors and what appears to be area coverage through out the office area to the right of the lobby. The smoke detectors at the fire doors are mounted on the walls on the lobby side and appear to exceed 12" down from the ceiling
|
BLD04-00136
| FIRE-Final Inspection | 3/3/2004 | 3/3/2004 | 3/3/2004 12:00:00 AM | A | PASS |
|
|
fire life safety finaled
|
FIR03-00623
| INSP-Final Inspection | 3/3/2004 | 3/3/2004 | 3/3/2004 12:00:00 AM | P | PASS |
|
|
fire alarm finaled 3/3/2004 12:39:51 PM
|
MIS04-00068
| FIR-Final | 3/3/2004 | 3/3/2004 | 3/3/2004 12:00:00 AM | P | PASS |
|
|
life safety finaled 3/3/2004 12:56:06 PM
|