FIR05-00107
| INSP-Sprinkler Rough-in | 3/3/2005 | 3/3/2005 | 3/3/2005 12:00:00 AM | | FAIL |
|
|
Inspection was for vaulted ceiling in the elevator lobby. The sprinkler piping on plans is 1 1/4" but piping is actually 1". Notified contractor that the piping laying on top of the soffits must meet nfpa 13 requirements for hanging. I could bent the soffit with my own weight. 3/3/2005 12:33:05 PM
|
FIR04-00774
| INSP-Alarm Testing | 2/28/2005 | 3/3/2005 | 3/3/2005 12:00:00 AM | A | PASS |
|
|
fire alarm finaled 3/3/2005 12:33:50 PM
|
FIR04-00666
| INSP-Sprinkler Rough-in/Hydro | 3/2/2005 | 3/3/2005 | 3/3/2005 12:00:00 AM | A | PART |
|
|
First floor center section of the building is ok to cover. Insulation is not being added. 3/3/2005 1:49:30 PM
|
FIR04-00684
| INSP-Supply line flush | 3/3/2005 | 3/3/2005 | 3/3/2005 12:00:00 AM | A | PART |
|
|
Underground supply piping is ok to cover. Notified contractor that a tamper switch would be needed for the Post Indicator Valve. 3/3/2005 1:18:56 PM
|
BLD04-02509
| FIRE-Final Inspection | 3/3/2005 | 3/3/2005 | 3/3/2005 12:00:00 AM | P | CANC |
|
|
Door hardware not installed yet. To be rescheduled 3/3/2005 3:52:11 PM
|
FIR04-00807
| INSP-Sprinkler Rough-in/Hydro | 3/3/2005 | 3/3/2005 | 3/3/2005 12:00:00 AM | P | PART |
|
|
Piping in room southwest of stairs can be covered. Per contractor plans are being resubmitted to show changes in piping. 3/3/2005 3:51:35 PM
|