Inspections for the day of: Friday, March 3, 2006.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy James
TitleMEC-COM/RES INSPECTOR
Phone #794-9461
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC05-01961 Conference3/3/20063/3/20063/6/2006 1:09:30 PMPPASS
Please call Clair 30 minutes before heading out there. ; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
MEC05-04298 MEC-Aging Inspection3/3/20063/3/20063/3/2006 3:33:30 PM PEND
wip
MEC06-00195 Final3/3/20063/3/20063/3/2006 3:20:42 PMPPASS
Denton; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
MEC06-00672 Final3/2/20063/3/20063/3/2006 2:28:18 PMPPASS
Please call Mike 30 minutes before going out and he will let you into both units. ; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
MEC06-00653 Final3/2/20063/3/20063/3/2006 2:28:07 PMPPASS
Please call Mike 30 minutes before going out. He will let you into both units. Thank you!! Veronica; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
MEC06-00577 Final3/2/20063/3/20063/3/2006 2:27:48 PMPPASS
Phone #: ###-#### x111 Internet Inspection Request from: LINDA DORN
MEC06-00662 Rough-in3/2/20063/3/20063/3/2006 2:27:31 PMPPASS
Scheduled by a contractor via Hello! on 3/2/2006 at 5:30:41 PM. Contact: ###-####.
MEC06-00545 Rough-in3/3/20063/3/20063/3/2006 1:56:35 PMPCANC
we finally have the fireplaces in, so this is kind of a final on the mechanical rough in. Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek Inspection cancelled from web by: Andrea Creek
MEC06-00670 Final3/2/20063/3/20063/3/2006 1:44:40 PMPPASS
johnsons prop mgmnt ###-####
MEC06-00680 Rough-in3/3/20063/3/20063/3/2006 1:16:34 PMPPASS
Please call Grant with any questions ###-####; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
MEC06-00697 Final3/3/20063/3/20063/3/2006 12:12:50 PMPPASS
PAT PAGER #99763; Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
MEC06-00695 Final3/3/20063/3/20063/3/2006 12:12:35 PMPPASS
PAT PAGER #99763; Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
MEC06-00669 Final3/3/20063/3/20063/3/2006 12:11:44 PMPPASS
David; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
MEC06-00382 Rough-in3/2/20063/3/20063/3/2006 10:04:02 AMAFAIL
Phone #: ###-#### Internet Inspection Request from: Stacy Ware
no access
MEC06-00537 Pressure Test3/2/20063/3/20063/3/2006 9:43:56 AMAPASS
Scott -- for rough in and gas test; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
MEC06-00537 Rough-in3/2/20063/3/20063/3/2006 9:43:35 AMAPASS
Scott -- for rough in and gas test; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
check gas pipe size change to 11/2" to meter from out of ground
MEC06-00535 Rough-in3/2/20063/3/20063/3/2006 9:18:52 AMAPASS
Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
MEC06-00608 Rough-in3/2/20063/3/20063/3/2006 9:05:30 AMAFAIL
Gas Pipe 2 Pound System; Phone #: ###-#### Internet Inspection Request from: Bruce Younger
1" clearance to b-vent at flex duct and roofing material, need insulation shield, pressure test ok
MEC06-00545 Rough-in3/2/20063/3/20063/3/2006 8:59:39 AMACANC
we finally have the fireplaces installed, so this is a final rough in inspection. Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek Inspection cancelled from web by: Andrea Creek