BLD05-02235
| BLD-Framing/Rough-in | 3/2/2006 | 3/3/2006 | 3/3/2006 4:40:00 PM | P | PASS |
|
|
Internet Inspection Request from: Carey Allen
|
BLD05-03125
| BLD-Energy code compliance | 3/2/2006 | 3/3/2006 | 3/3/2006 4:06:27 PM | P | PASS |
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. All framing issues have been resolved.
|
BLD05-01422
| BLD-Conference | 3/3/2006 | 3/3/2006 | 3/3/2006 3:56:54 PM | P | DONE |
|
|
please call 30 min prior//anthony; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Meet with contractor on site regarding membrane penetrations with framing members into one hr. wall. Will meet with G. Slane and contractor on site for possible solutions.
|
BLD05-02234
| BLD-Framing/Rough-in | 2/28/2006 | 3/3/2006 | 3/3/2006 3:54:58 PM | P | FAIL |
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Complete lateral bracing. ok to insulate. c/n posted.
|
BLD05-02406
| BLD-Footing | 3/2/2006 | 3/3/2006 | 3/3/2006 3:20:02 PM | P | CANC |
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-02706
| BLD-Energy code compliance | 3/2/2006 | 3/3/2006 | 3/3/2006 1:43:20 PM | P | PASS |
|
|
Internet Inspection Request from: Carey Allen. All framing issues have been repaired.
|
BLD05-01568
| BLD-Final | 3/3/2006 | 3/3/2006 | 3/3/2006 11:08:32 AM | P | PASS |
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-02694
| BLD-Foundation | 3/2/2006 | 3/3/2006 | 3/3/2006 11:07:35 AM | A | PASS |
|
|
Doug; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD05-02692
| BLD-Foundation | 3/2/2006 | 3/3/2006 | 3/3/2006 11:07:14 AM | A | PASS |
|
|
Doug; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD05-02690
| BLD-Foundation | 3/2/2006 | 3/3/2006 | 3/3/2006 11:07:03 AM | A | PASS |
|
|
Doug; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD05-02686
| BLD-Foundation | 3/2/2006 | 3/3/2006 | 3/3/2006 11:06:49 AM | A | PASS |
|
|
Doug; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD05-01226
| BLD-Final | 3/2/2006 | 3/3/2006 | 3/3/2006 10:41:53 AM | A | FAIL |
|
|
Chris -- call 1st before inspection for lockbox code access; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Needs egress ladders in window wells at bedrooms.
|
BLD05-02614
| BLD-Energy code compliance | 3/2/2006 | 3/3/2006 | 3/3/2006 10:40:31 AM | A | PASS |
|
|
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD05-02412
| BLD-Concrete | 3/2/2006 | 3/3/2006 | 3/3/2006 9:46:07 AM | A | PART |
|
|
center footings Internet Inspection Request from: Adrian Marriage. Interior footing for bearing wall.
|
BLD05-02319
| BLD-Other | 3/2/2006 | 3/3/2006 | 3/3/2006 9:15:53 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 3/2/2006 at 3:30:38 PM. Contact: ###-####. Insprcted ceiling grid upstairs. Floating system installed. Needs to submit a ceiling plan. Also inspected anchoring of racking in warehouse. Appears to be installed as per plan.
|
BLD05-01568
| DOC - Permit Finaled | 3/3/2006 | 3/3/2006 | 3/3/2006 12:00:00 AM | P | PASS |
|
|
|