Inspections for the day of: Monday, March 3, 2008.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC03-01439 Site Final3/3/20083/3/20083/3/2008 4:16:16 PMPPASS
site stabilized
CAS#460
ESC07-01462 BMP Violation3/3/20083/3/20083/3/2008 3:59:48 PMPPART
Tracking cleaned up. Wattle installed (not correct) where disturbed soil is. Needs to be staked through. Contacted (rp) and instructed him on the proper way of installation.
CAS#460
###-####
ESC03-00556 Site Final3/3/20083/3/20083/3/2008 1:50:22 PMPPASS
Site stabilized
CAS#460
ESC04-00279 Site Final3/3/20083/3/20083/3/2008 1:49:57 PMPPASS
site stabilized
CAS#460
ESC04-00433 Site Final3/3/20083/3/20083/3/2008 1:36:45 PMPPASS
Site stabilized
CAS#460
ESC04-00736 Site Final3/3/20083/3/20083/3/2008 1:23:47 PMPPASS
Site complete. Everythis stabilized.
CAS#460
ESC06-00721 Site Preparation3/3/20083/3/20083/3/2008 1:08:27 PMPPART
Per call with (RP) silt fence at the west end of project needs to be repaired. Will be happening this week. Other than that, site is good.
CAS#460
###-####
ESC07-00394 Random Inspection3/3/20083/3/20083/3/2008 11:14:49 AMPPART
Siltfence installed on partial of lot. Recommended extending it in section that can be a potential concern. North side of project is a slope that is greater than 2' to 1'. Was told by RP that will be sprayed with a tactifier and native seed will be applied.
Also instructed to up date Erosion control Map of any changes due to phase of project.
Will re-inspect on Friday the 3/7/08
CAS#460
###-####
ESC08-00072 Site Preparation3/3/20083/3/20083/3/2008 9:51:13 AMAPASS
Removal of contaminated soil. Street sweeper on site to stay on top of any type of tracking onto 17th st. Dust control is the only issue that could appear. But soil is moist enough. There contigency plan would be to moisten soi with water. PASS
CAS#460
###-####
ESC07-01399 Site Final3/3/20083/3/20083/3/2008 9:46:10 AMAPASS
Demolition of building has been complete ESC permit sign will be taken down.
ESC08-00064 Conference2/29/20083/3/20083/3/2008 8:55:24 AMAPART
Met with Ryan Ward (RP) went over the timeline of project regarding the erosion and sediment control measures and practices. Discussed with Ryan over Construction entrances on and off of porject area. Explained to him that some type of geotexile fabric is manditory as underlayment for the rock entrance. There are multiple entrances on project that are temporary for access. So i explaned if they are not being used then they need to be blocked off. These temporary entrances will be gone in about a week due to utility construction. A Construction entrance will be made during this period in Constuction.
CAS#460
###-####