BLD09-00070
| FIRE-Final Inspection | 3/3/2009 | 3/3/2009 | 3/3/2009 4:13:03 PM | P | PASS |
|
|
Fire life safety site inspection passed.
|
FIR09-00144
| INSP-Final Inspection | 3/3/2009 | 3/3/2009 | 3/3/2009 4:08:13 PM | P | PASS |
|
|
Scope of demo work per permit documents verified for completion, permit finaled.
|
FIR08-00699
| INSP-Sprinkler Rough-in | 3/2/2009 | 3/3/2009 | 3/3/2009 3:42:31 PM | A | PART |
|
|
Inspection for overhead work at sheetrock ceilings in restrooms area "A" approved for cover-locations also marked on plans. Also discussed exceptions allowed per NFPA 13 for non-sprinklered canopies and concealed spaces at the exterior portions of the building.
|
FIR08-00018
| INSP-Sprinkler Rough-in/Hydro | 3/2/2009 | 3/3/2009 | 3/3/2009 3:19:44 PM | A | FAIL |
|
|
See areas red-lined on approved plans for locations at the basement level system in need of adjustment including one missing upright, heads at the vicinity of two unit heaters will require a higher temp rating, one EQ brace is not attatched, provide a head cage at the upright below the stairs, one SW head is too low, the electrical room and one storage room are not yet finished and have changed floorplan/piping layout-will need record drawings indicating field modifications. Also inspected the 10th floor common corridor-OH is approved for cover, noted blockage of one head by an exit sign which can be relocated. Noted sw head coverage at the elevator pit to be adjusted to avoid obstructions to discharge by equipment.
|
FIR08-00863
| INSP-Supply line flush | 3/2/2009 | 3/3/2009 | 3/3/2009 1:57:10 PM | A | PART |
|
|
Underground fire supply line flush completed satisfactory.
|
BLD08-02249
| FIRE-Final Inspection | 3/2/2009 | 3/3/2009 | 3/3/2009 10:33:10 AM | A | PART |
|
|
Apt. unit 544 fire life safety okayed.
|
BLD09-00018
| FIRE-Final Inspection | 3/2/2009 | 3/3/2009 | 3/3/2009 10:31:38 AM | A | PART |
|
|
Unit 528 life safety inspection passed.
|
FIR08-00768
| FIR-Aging Inspection | 3/3/2009 | 3/3/2009 | 3/3/2009 9:53:03 AM | | DONE |
|
|
Work in progress, construction underway.
|
FIR08-00766
| INSP-Sprinkler Rough-in/Hydro | 3/2/2009 | 3/3/2009 | 3/3/2009 9:51:11 AM | A | PART |
|
|
See approved plan set for locations of three thrust blocks at tee's feeding system risers okayed for cover marked with today's date.
|