Inspections for the day of: Tuesday, March 3, 2009.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-00867 FIRE-Final Inspection3/2/20093/3/20093/4/2009 9:26:54 AMAFAIL
All items have been addressed except for verification of the cfm for the hvac units, verification that the two fire doors are still functional and provide a racking permit for the steel storage racks that exceed 8'-0" and for any solid pile storage that exceeds 12'-0".
FIR08-00675 INSP-Sprinkler Rough-in/Hydro3/2/20093/3/20093/4/2009 6:16:05 AMPPART
UG Hydro passed. The rough-in inspection of the first and second floors did not pass. The problem is alot of pendant heads were designed to be installed under duct work and they ended up not being installed under the duct work and/or the duct work has been moved. The heads now exceed 22" from the deck. The pipe size, hangers and earthquaking is ok. The third floor, standpipes and riser has not been inspected.
BLD07-03252 FIRE-Final Inspection3/2/20093/3/20093/3/2009 3:41:39 PMPPART
The Corrections expansion is ok to occupy.
FIR08-00287 INSP-Alarm Testing3/2/20093/3/20093/3/2009 3:40:21 PMPPASS
The fire alarm for the Corrections area is now complete.
FIR07-00874 INSP-Sprinkler Rough-in3/2/20093/3/20093/3/2009 3:39:16 PMPPASS
See the city approved plans for the canopy on the southwest corner of the building where the piping is ok to cover.
FIR08-00688 INSP-Final Inspection3/2/20093/3/20093/3/2009 9:41:42 AMAFAIL
No inspection was performed due to the city approved plans not being on site. I did check the strobe candella, spacing and heights while I was there and found no problems.