Inspections for the day of: Tuesday, March 3, 2009.
Number of inspections: 31
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-02186 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 4:56:23 PMPNR
Scheduled by a contractor via Hello! on 3/3/2009 at 7:26:54 AM. Contact: ###-####.
BLD08-02187 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 4:55:57 PMPNR
Scheduled by a contractor via Hello! on 3/3/2009 at 7:28:03 AM. Contact: ###-####.
BLD08-02188 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 4:55:23 PMPPASS
Scheduled by a contractor via Hello! on 3/3/2009 at 7:29:00 AM. Contact: ###-####. 2nd floor, 1st. layer, remaining side of 5/type x rock for 2hr. wall.
BLD08-02183 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 4:54:07 PMPPASS
Scheduled by a contractor via Hello! on 3/3/2009 at 7:31:47 AM. Contact: ###-####. 2nd. floor 1st layer of 5/8 type x rock both side for 2hr. fire wall.
BLD08-02189 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 4:53:02 PMPPASS
Scheduled by a contractor via Hello! on 3/3/2009 at 7:29:57 AM. Contact: ###-####. 2nd. floor, 1st layer remaining side of 5/8 type x for 2hr. fire wall.
BLD08-02182 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 4:51:03 PMPNR
Scheduled by a contractor via Hello! on 3/3/2009 at 7:30:50 AM. Contact: ###-####.
BLD08-02184 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 4:04:33 PMPNR
Scheduled by a contractor via Hello! on 3/3/2009 at 7:32:51 AM. Contact: ###-####.
BLD08-02185 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 4:04:08 PMPNR
Scheduled by a contractor via Hello! on 3/3/2009 at 7:33:52 AM. Contact: ###-####.
ESC08-00880 Tracking Control3/3/20093/3/20093/3/2009 2:25:18 PMPFAIL
Trackout is excessive, contacted rp, must be cleaned up by days end.
ESC08-00881 Tracking Control3/3/20093/3/20093/3/2009 2:24:24 PMPFAIL
Trackout is excessive, contacted rp, must be cleaned up by days end.
ESC08-00882 Tracking Control3/3/20093/3/20093/3/2009 2:23:34 PMPFAIL
trackout is excessive, rp has been notified and must be cleaned up by days end.
ESC08-00883 Tracking Control3/3/20093/3/20093/3/2009 2:22:49 PMPFAIL
Excessive trackout, rp has been notified and must be cleaned up by end of day.
ESC08-00888 Tracking Control3/3/20093/3/20093/3/2009 2:21:27 PMPFAIL
Due to rain and heavy equipement going from unpaved to paved areas, track out is excessive and has reached an unacceptable level. Contacted James Larkin (rp) to notify him of situation. Must be cleaned up by days end.
ESC08-00886 Tracking Control3/3/20093/3/20093/3/2009 2:17:32 PMPFAIL
Due to rain and heavy equipement going from paved to unpaved areas, trackout is excessive and at an unacceptable level. James lLarkin (rp) has been contacted and needs to have trackout cleaned up by end of day.
ESC08-00885 Tracking Control3/3/20093/3/20093/3/2009 2:15:18 PMPFAIL
Due to rain storms and heavy equipement going from paved unpaved to paved areas, trackout has increased and is at an unaceptable level. James Larkin (rp) has been contacted. Needs to hace all trackout cleaned up by end of day.
BLD08-02195 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 1:52:24 PMPNR
Scheduled by a contractor via Hello! on 3/3/2009 at 7:38:36 AM. Contact: ###-####.
BLD08-02194 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 1:52:09 PMPNR
Scheduled by a contractor via Hello! on 3/3/2009 at 7:38:01 AM. Contact: ###-####.
BLD08-02196 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 1:51:53 PMPPASS
Scheduled by a contractor via Hello! on 3/3/2009 at 7:39:13 AM. Contact: ###-####.. 2nd floor, 2nd. layer, one side only. ok.
BLD08-02190 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 1:42:53 PMPPART
Scheduled by a contractor via Hello! on 3/3/2009 at 7:35:00 AM. Contact: ###-####. 1st. floor, 1st. layer of 5/8 type x rock , one side only for 2hr. fire wall.
BLD08-02192 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 1:41:58 PMPPART
Scheduled by a contractor via Hello! on 3/3/2009 at 7:36:33 AM. Contact: ###-####. 1st. floor, 1st. layer of 5/8 type x rock for 2hr. wall, one side.
BLD08-02193 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 1:39:25 PMPNR
Scheduled by a contractor via Hello! on 3/3/2009 at 7:37:19 AM. Contact: ###-####.
BLD08-02191 BLD-Framing/Rough-in3/3/20093/3/20093/3/2009 1:38:53 PMPNR
Scheduled by a contractor via Hello! on 3/3/2009 at 7:35:57 AM. Contact: ###-####.
ESC08-00981 Random Inspection3/3/20093/3/20093/3/2009 10:53:26 AMAPASS
ESC permit signs are posted. BMP's in place. General site conditions were good.
ESC08-00979 Random Inspection3/3/20093/3/20093/3/2009 10:51:35 AMAPASS
ESC permit signs posted. BMP's in place. General site conditions were good.
BLD08-02395 BLD-Foundation3/2/20093/3/20093/3/2009 10:50:42 AMAPASS
ian Phone #: ###-####. Perimeter stemwalls and pedestals on column pad footings. ok.
BLD08-02393 BLD-Foundation3/2/20093/3/20093/3/2009 10:49:46 AMAPASS
ian Phone #: ###-####. Perimeter stemwalls and column pad pdestals. ok.
ESC08-00916 Site Preparation3/3/20093/3/20093/3/2009 10:38:39 AMAFAIL
BMP's in place. Needs to post ESC sign. Contacted RP (Ray) and let him know that esc permit sign must be posted prior to conc. being placed. Rp noted that he was on his way to post sign.
BLD08-02256 BLD-Footing3/3/20093/3/20093/3/2009 10:36:13 AMAPASS
Scheduled by a contractor via Hello! on 3/3/2009 at 6:57:13 AM. Contact: ###-####.
BLD08-01127 BLD-Framing/Rough-in3/2/20093/3/20093/3/2009 10:03:30 AMAPASS
Scheduled by a contractor via Hello! on 3/2/2009 at 3:10:03 PM. Contact: ###-####. Interior partition walls ok. Also reinspected priviously installed ceiling grid, system has been matched to exisiting system. ok.
ESC08-00464 Random Inspection3/3/20093/3/20093/3/2009 10:01:30 AMAPASS
BLD08-01321 BLD-Final3/2/20093/3/20093/3/2009 9:01:38 AMANR
Joe Phone #: ###-####. Needs other trades and zoning first. Contacted Joe wtih EKC and let him know what needed to be completed prior to structural sign off.