Inspections for the day of: Wednesday, March 3, 2010.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-02204 FIRE-Conference3/3/20103/3/20103/4/2010 5:46:00 PMPDONE
Work in progress, construction underway.
FIR08-00676 INSP-Conference3/2/20103/3/20103/3/2010 5:07:20 PMPDONE
On site conference regarding revised pendent head locations to avoid obstructions to discharge and pattern development at AMH equipment. Discussed additional heads, relocated heads, obstructions at ionization bar and track hanger supports.
FIR09-00501 INSP-Final Inspection3/3/20103/3/20103/3/2010 5:00:35 PMPNR
Exam room 319 missing drop sprinklers, escutcheons at some areas are not yet installed.
FIR09-00588 INSP-Final Inspection3/2/20103/3/20103/3/2010 4:58:26 PMAPART
Correction items include relocate duct detector at RTU 302, provide correct sample tubes per mfg. cut sheets for respective duct widths at all 8 DD, post an updated map at the panel per review comments, provide a lock and label at the breaker to the new nac, provide as-builts for field modifications including added notification appliances for the new exam room 340, stair 302, and revised operations matrix for duct detectors programed as alarm, contractor to check sync module for discrepancy between circuts N1:1- N1:2 and N1:3. Remainder of the scope of work passed inspection.
FIR09-00642 INSP-Sprinkler Rough-in3/2/20103/3/20103/3/2010 4:41:19 PMAPART
Inspection for fire resistive coatings at exposed wood surfaces above the drop ceilings at the new restroom entry vestibules.