Inspections for the day of: Thursday, March 3, 2016.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-00674 Final3/3/20163/3/20163/3/2016 3:41:54 PMPNR
Please inspect sign wiring. Phone #: ###-#### Inspection requested via web by ERIC CENTERS Underground going in at time of inspection
ELE16-00674 Electrical Rough-In3/3/20163/3/20163/3/2016 3:41:08 PMPPASS
Please inspect sign wiring. Phone #: ###-#### Inspection requested via web by ERIC CENTERS Underground rough in ok cover
ELE16-00136 Final3/3/20163/3/20163/3/2016 3:00:46 PMPPASS
Phone #: ###-#### Inspection requested via web by daniel bibikov
Final ok
ELE15-03489 Final3/3/20163/3/20163/3/2016 1:44:55 PMPFAIL
Phone #: ###-#### Inspection requested via web by ERIC CENTERS
110.7- Exam 8 GFCI not working, wireman found screw in MC from fire box installation.
ELE16-00166 Final3/3/20163/3/20163/3/2016 1:32:15 PMPPASS
Phone #: ###-#### Inspection requested via web by TOM BICANDI Final ok
ELE16-00372 Final3/3/20163/3/20163/3/2016 12:23:46 PMPFAIL
Phone #: ###-#### Inspection requested via web by Rowdy Monroe
408.41- Each grounded conductor shall terminate in the panelboard in an individual terminal that is not also used to another conductor.
ELE13-01339 ELE-Aging Inspection3/3/20163/3/20163/3/2016 11:26:40 AM PASS
Contractor will check on job and call with results.
ELE16-00596 Electrical Rough-In3/2/20163/3/20163/3/2016 10:50:07 AMAPASS
BONDING/GROUNDING INSPECTION Phone #: ###-#### Inspection requested via web by CHRIS CARMINE
Underground ight to shop, bonding of metal frame, 4 points for perimeter, light and ladder. Rough in ok cover
ELE16-00513 Final3/2/20163/3/20163/3/2016 10:06:23 AMAPASS
Phone #: ###-#### Inspection requested via web by Jonathan Poot
Final ok
ELE16-00203 Electrical Rough-In3/2/20163/3/20163/3/2016 9:25:11 AMACANC
Jose Phone #: ###-####
Needed conference
ELE16-00203 Conference3/3/20163/3/20163/3/2016 9:24:42 AMPDONE
Jose Phone #: ###-####
Discussed required grounding electrode system for new fire pump service. They poured and concrete encased in floor of new fire pump room. Shall use all available grounding electrodes. Fire pump underground metal piping system, concrete encased, contractor to ensure main service grounding electrode system bonds to fire sprinkler piping system to tie all together.
ELE16-00659 Temporary Service3/2/20163/3/20163/3/2016 8:49:46 AMAPASS
Temp pole Phone #: ###-#### Inspection requested via web by TOM BICANDI
t/s u/g n ok