MEC16-00951
| Conference | 3/3/2016 | 3/3/2016 | 3/3/2016 4:21:08 PM | P | FAIL |
|
|
Would like Mid PM. Call Christina when on way ###-####. Thank You. Phone #: ###-#### Inspection requested via web by Xanti Berria - need uv protection on lineset
|
PLM16-00565
| Water Heater Final | 3/1/2016 | 3/3/2016 | 3/3/2016 3:29:38 PM | P | PASS |
|
|
Please call Kristen before arriving, thank you. Phone #: ###-#### Inspection requested via web by TERESA HUTTO
|
MEC16-00638
| Pressure Test | 3/3/2016 | 3/3/2016 | 3/3/2016 2:57:24 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka - 20lb gas pass, 5lb flue fail
|
MEC16-00638
| Rough-in | 3/3/2016 | 3/3/2016 | 3/3/2016 2:55:47 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka - 5lb flue test fail, exhaust fan not connected in the master bathroom
|
MEC16-00501
| Pressure Test | 3/1/2016 | 3/3/2016 | 3/3/2016 2:15:52 PM | P | PASS |
|
|
PLease call Daryl with any questions. Phone #: ###-#### Inspection requested via web by Diane Day - 20lb gas 5lb flue
|
MEC16-00501
| Rough-in | 3/1/2016 | 3/3/2016 | 3/3/2016 2:14:37 PM | P | PASS |
|
|
PLease call Daryl with any questions. Phone #: ###-#### Inspection requested via web by Diane Day
|
MEC15-05194
| Final | 3/2/2016 | 3/3/2016 | 3/3/2016 1:42:41 PM | P | FAIL |
|
|
final - call brandon at the office if any questions Phone #: ###-#### Inspection requested via web by Brandon Sorensen - need air balance report and duct blast report on site
|
MEC16-00822
| Pressure Test | 3/2/2016 | 3/3/2016 | 3/3/2016 11:52:12 AM | A | PASS |
|
|
Rough In ; Pressure Test Curtis: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello - 20lb gas, 5lb flue
|
MEC16-00822
| Rough-in | 3/2/2016 | 3/3/2016 | 3/3/2016 11:51:10 AM | A | PASS |
|
|
Rough In ; Pressure Test Phone #: ###-#### Inspection requested via web by Frank Marturello
|
MEC16-00634
| Rough-in | 3/2/2016 | 3/3/2016 | 3/3/2016 10:59:45 AM | A | FAIL |
|
|
Zach Phone #: ###-####// call 20 min prior - approved plans call out for 6" fresh air, need to insulate supply duct in attic.
|
MEC16-00633
| Rough-in | 3/2/2016 | 3/3/2016 | 3/3/2016 10:59:13 AM | A | FAIL |
|
|
Zach Phone #: ###-####-- please call 20 min prior - approved plans call out for 6" fresh air, need to insulate supply duct in attic.
|
MEC16-00764
| Rough-in | 3/2/2016 | 3/3/2016 | 3/3/2016 10:15:28 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero - Need clearification from manufacture on framing clearances
|
MEC15-02759
| Rough-in | 3/2/2016 | 3/3/2016 | 3/3/2016 8:40:56 AM | A | PART |
|
|
Jim ###-#### - Showers on the east side of the 5th floor ceilings okay to cover
|
MEC15-02630
| Mec-Aging Inspection | 3/3/2016 | 3/3/2016 | 3/3/2016 7:22:03 AM | | CANC |
|
|
|
MEC15-03228
| Mec-Aging Inspection | 3/3/2016 | 3/3/2016 | 3/3/2016 7:21:24 AM | | CANC |
|
|
|