Inspections for the day of: Friday, March 3, 2017.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-02101 Final3/3/20173/3/20173/3/2017 1:27:59 PMPPASS
Work for driveway ice melt cover under permit ELE12-03075. Final ok
ELE17-00037 Final3/2/20173/3/20173/3/2017 1:13:59 PMPPART
Final Inspection for Building #5
Contact Dan Hutchinson
Thank you. Phone #: ###-#### Inspection requested via web by Cathy Duchek
513 excluded, rest of building 5 TCO ok.
ELE17-00341 Rough-In Permanent Service3/2/20173/3/20173/3/2017 12:17:05 PMAFAIL
Everything is complete except the patios not completed. Customer would like service and interior cover. Phone #: ###-#### Inspection requested via web by Ryan Wake
WUI zone A.
210.52- Fixed panel of slider in family room counts as wall space and shall have a receptacle outlet installed within 6' of door.
300.4- All wiring run thru bored holes that do not maintain 1 1/4" of framing surface shall be protected from physical damage. Garage sensor wiring. Master stool fan shall have abrasion protection for NM cable. Remote hood shall have abrasion protection for cable.
300.15- Splices for temp hook up for furnaces shall be contained in a box.
400.8- Remote hood has flexible cord. Flexible cords shall not be installed in a attic space.
ELE17-00528 Conference3/1/20173/3/20173/3/2017 11:10:15 AMADONE
Consult for service upgrade
Contact Seth VanWassenhove to set up time and access.
###-#### Phone #: ###-#### Inspection requested via web by Cathy Duchek
Discussed the replacement of a fused panel board located in basement in Electrical room B. Main electrical room has labels on 6 service disconnecting means, shall verify grounding electrode system and bonding of grounded conductors. From a 200 amp single phase sub disconnect in ELE room A, a new MC sub feed to ELE rm B to be install new 200 amp panel board. Any life safety issues shall be addressed if any. All existing panels on load side panel in ELE rm B will be up graded in future. Job to be done in phases as funds become available.