ESC17-00077
| Site Preparation | 3/3/2017 | 3/3/2017 | 3/6/2017 1:14:04 PM | P | PEND |
|
|
Brain Phone #: ###-####
Permit sign posted. Vegetation preserved at bottom of site and along sidewalk. Large lot, excavator to store foundation dirt on site but away from perimeter. Will discuss construction entrance when driveway apron is cut. Approved for foundation phase.
|
ESC16-00406
| Tracking Control | 3/1/2017 | 3/3/2017 | 3/6/2017 12:20:07 PM | P | CANC |
|
|
|
ESC16-01009
| Site Preparation | 3/3/2017 | 3/3/2017 | 3/6/2017 8:00:05 AM | P | CANC |
|
|
|
ESC17-00018
| General Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 5:12:42 PM | P | PASS |
|
|
Turbidity sampling of dewatering operation conducted concurrently with CA Paving John M.
Samples of the discharge from ditch into Walling Creek wetland area were between 47-53 NTU on the City meter. Background turbidity upstream in wetland was 2-3 NTU.
In upstream drainage ditch north of Warm Springs bypass had reading of 5-7 NTU. Samples from water from the end of pipe with sediment sack were 60-63 NTU.
Discharges is currently with compliance limits. It should also be noted that meter used by CA had differing measurements but were also within compliance. They will be sampling 3x daily until operation is complete. Work will occur Saturday, no work Sunday and is scheduled to complete on Monday.
No new corrections requested. Will check in on Monday
|
ESC15-00378
| General Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 4:48:00 PM | | PEND |
|
|
revegetation phase...
|
ESC16-00646
| Aging Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 4:47:32 PM | | CANC |
|
|
|
ESC15-01391
| General Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 2:34:48 PM | | CANC |
|
|
|
ESC16-01646
| Site Preparation | 3/3/2017 | 3/3/2017 | 3/3/2017 2:21:44 PM | P | FAIL |
|
|
Cameron Phone #: ###-####
Need to install sediment protection on storm drain on Cadet north of site. Permit sign posted.
Verbal Correction Request to Cameron via voicemail. No work started yet. Rescheduled.
|
ESC16-01645
| Site Preparation | 3/3/2017 | 3/3/2017 | 3/3/2017 2:21:10 PM | P | FAIL |
|
|
Cameron Phone #: ###-####
Need to install sediment protection on storm drain on Cadet north of site. Permit sign posted.
Verbal Correction Request to Cameron via voicemail. No work started yet. Rescheduled.
|
ESC16-00557
| Complaint Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 2:11:49 PM | P | PEND |
|
|
investigation of complaint in progress. Dual ESC permits with same contractor. Will clost this one, see ESC16-00885
|
ESC16-00855
| Complaint Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 2:10:13 PM | P | PEND |
|
|
installation of water circulating sytem along Logger's Creek. Investigation in progress
|
ESC16-01404
| Random Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 1:36:42 PM | A | FAIL |
|
|
No permit signs on site. No regular housekeeping occuring. Need to sweep up sidewalk, gutters and street.
|
ESC16-01630
| General Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 12:27:46 PM | A | FAIL |
|
|
Loose dirt and debris around site. Trackout from site. DI filter mat on Edelweiss needs replacement. Working with Stetson and developer to clean up this subdivision.
|
ESC16-00870
| General Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 12:25:36 PM | P | FAIL |
|
|
Loose dirt and trackout around site and culdesac. Need to sweep sidewalks and gutters, pick up any loose trash. Check storm drain filter bag.
|
ESC15-00957
| General Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 12:16:06 PM | | PEND |
|
|
request for new concrete washout facility issued 3/2. RP for D. Evans construction said one would be installed by next week as well as street sweeping...
|
ESC14-00432
| General Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 11:21:39 AM | | PEND |
|
|
All homes complete and common areas lanscaped.
Called Hayden Homes Tom to disclose final ESC requests as noted previously:
- remove all temp DI sediment bags (2 on Basseri and all inlets on southern phase) - remove sections of remaining silt fence at both ends of 5 mile creek through subdivision - pick up any remaining windblown trash along creek banks
Tom agreed to have it completed during next week. Site final scheduled for next inspection.
|
ESC04-00526
| DOC - Permit Finaled | 3/3/2017 | 3/3/2017 | 3/3/2017 10:58:56 AM | P | PASS |
|
|
old expired permit in database. no inspection
|
ESC04-01456
| DOC - Permit Finaled | 3/3/2017 | 3/3/2017 | 3/3/2017 10:58:32 AM | P | PASS |
|
|
old expired permit in system. no inspection
|
ESC16-01550
| Random Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 10:18:01 AM | A | PEND |
|
|
WIP. No trackout or windblown trash issues.
Correction: No ESC permit sign.
Need to post new ESC sign - ESC inspector will post sign next inspection.
|
ESC16-00819
| DOC - Permit Finaled | 3/3/2017 | 3/3/2017 | 3/3/2017 10:06:16 AM | P | PASS |
|
|
|
ESC16-00327
| Site Final | 3/3/2017 | 3/3/2017 | 3/3/2017 9:56:46 AM | A | PASS |
|
|
Work complete at new Maverik . Open areas have been landscaped and stabilized. MS4 inlets on Ustick have had DI bags removed, Permanent storm drains installed and free of BMPs. ESC permit conditions satisfied.
Note: open parcel to east of site 12067 Ustick is soon to be a new coffee drive thru. No issues at time of inspection.
|
ESC15-00547
| Site Final | 3/3/2017 | 3/3/2017 | 3/3/2017 9:41:41 AM | A | PASS |
|
|
Gatehouse subdivision development, vertical construction complete. WIP on carports in parking lot and covered under ESC16-01677. No further inspections on this permit
|
ESC16-00977
| Site Final | 3/3/2017 | 3/3/2017 | 3/3/2017 9:34:15 AM | A | PASS |
|
|
Work complete and ground around modular building is stabilized landscaped. No construction materials or disturbed area on site. BLD finaled.
|
ESC15-00547
| General Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 9:28:51 AM | | PASS |
|
|
Gatehouse apartments are now occupied. MS4 sediment filter mat removed from Ustick, frontage is landscaped stabilized. Some minor work occuring in parking lot with soil stockpile. Need to complete and sweep and remove filter mat from private DI on west side of entrance. No immediate corrections.
|
ESC16-00430
| General Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 9:22:09 AM | | PASS |
|
|
WIP. Construction entrance in good condition. No trackout, discharges, or loose dirt on sidewalk observed.
|