MIS18-00472
| MIS-Aging Inspection | 3/3/2020 | 3/3/2020 | 3/10/2020 10:42:22 AM | | CANC |
|
|
|
BLD13-02186
| BLD-Final | 2/25/2020 | 3/3/2020 | 3/6/2020 3:30:24 PM | P | PEND |
|
|
Mark Phone #: ###-####
|
BLD19-04072
| BLD-Foundation | 3/2/2020 | 3/3/2020 | 3/3/2020 4:43:39 PM | P | NR |
|
|
Pat Phone #: ###-####
|
BLD20-00389
| BLD-Final | 3/3/2020 | 3/3/2020 | 3/3/2020 4:35:45 PM | P | DONE |
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Dale Hope,, done and gone
|
BLD20-00389
| DOC - Permit Finaled | 3/3/2020 | 3/3/2020 | 3/3/2020 4:22:16 PM | P | PASS |
|
|
done.. gone
|
BLD20-00619
| BLD-Footing | 3/3/2020 | 3/3/2020 | 3/3/2020 4:21:40 PM | P | PEND |
|
|
Brooks Phone #: ###-####// needs hillside approval 1st
|
BLD19-03056
| BLD-Foundation | 3/3/2020 | 3/3/2020 | 3/3/2020 4:20:26 PM | P | PART |
|
|
Jon Phone #: ###-####// interior slab footings work in progress,,ok
|
BLD18-03383
| BLD-Conference | 3/3/2020 | 3/3/2020 | 3/3/2020 4:19:42 PM | P | PEND |
|
|
verify status on building/ permit// no one around
|
BLD18-04407
| BLD-Final | 3/2/2020 | 3/3/2020 | 3/3/2020 2:53:20 PM | P | PASS |
|
|
Need final walkthrough on corrections; window tempered, window opening restrictions and landings for French doors. Thanks! Phone #: ###-#### Inspection requested via web by Beau Brazier// recomended for historic award,, c of c issued
|
BLD18-04407
| DOC - Permit Finaled | 3/3/2020 | 3/3/2020 | 3/3/2020 2:51:54 PM | P | PASS |
|
|
|
BLD19-03506
| BLD-Conference | 3/3/2020 | 3/3/2020 | 3/3/2020 2:20:29 PM | P | PART |
|
|
Please call Erik @ 310.755.5987 15 minutes in advance so I can be there. This is for Framing inspection prior to insulating. Phone #: ###-#### Inspection requested via web by Erik Hagen/// frame walk through,, fire blocking,, joist connections,, header support,, trades,, etc.
|
BLD20-00670
| BLD-Foundation | 3/2/2020 | 3/3/2020 | 3/3/2020 1:35:49 PM | P | PART |
|
|
stem wall // David Phone #: ###-####// missed a footing point load,, need to get a fix and show the next inspector when the slab footings are called in,, work in progress.. ok to pour stem wall when ready
|
BLD19-04775
| BLD-Framing/Rough-in | 3/2/2020 | 3/3/2020 | 3/3/2020 12:51:41 PM | A | PASS |
|
|
Jay Walters will be the onsite contact Phone #: ###-#### Inspection requested via web by BRS Permitting// ok per engineer
|
BLD19-03799
| BLD-Conference | 3/2/2020 | 3/3/2020 | 3/3/2020 11:41:17 AM | A | PEND |
|
|
Phone #: ###-#### Inspection requested via web by John Treat,, will need to go through architect to get fix to leave garage un-finished
|
MIS20-00043
| BLD-Conference | 2/24/2020 | 3/3/2020 | 3/3/2020 10:57:24 AM | A | DONE |
|
|
follow up...// permit has been issued
|
MIS20-00043
| DOC - Permit Finaled | 3/3/2020 | 3/3/2020 | 3/3/2020 10:57:07 AM | P | PASS |
|
|
permit issued
|
BLD19-04496
| BLD-Conference | 3/2/2020 | 3/3/2020 | 3/3/2020 10:56:06 AM | A | PART |
|
|
Dave Phone #: ###-#### - Dave called to change time to tomorrow morning,, under floor ok after taping seams and around pony wall footings.. will verify at the final
|
BLD19-04845
| BLD-Footing | 3/2/2020 | 3/3/2020 | 3/3/2020 10:37:35 AM | A | PART |
|
|
aNDY Phone #: ###-####,, work in progress,, ok
|
BLD19-03951
| BLD-Framing/Rough-in | 3/2/2020 | 3/3/2020 | 3/3/2020 10:22:55 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger
|