Inspections for the day of: Tuesday, March 30, 1999.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-00758 INSP - Foundation3/30/19993/30/19993/31/1999 12:00:00 AMPPART
03/30/99 340 - stem wall ###-#### 316 area, poured looks ok, no plans
BLD99-00775 INSP - Foundation3/30/19993/30/19993/31/1999 12:00:00 AMPPART
03/30/99 340 - ###-#### JAMES//STEM WALL poured, no pln. 316 area
BLD97-03362 INSP - Final3/30/19993/30/19993/30/1999 12:00:00 AM PASS
/ / 340 - STRUCT. OK FOR PERM C/O...
BLD98-02788 INSP - Framing/Rough-in3/30/19993/30/19993/30/1999 12:00:00 AM PART
/ / 340 - VERBAL C/N , NEED LISTING OR DETAIL FOR LITES, FIRESTOP PENE
BLD99-00547 INSP - Final3/30/19993/30/19993/30/1999 12:00:00 AM PASS
/ / 340 - CONF W/ CATHY W... STRUCT OK, NEED VERIFY W/ PUB WKS FOR SEW
BLD99-00687 INSP - Framing/Rough-in3/30/19993/30/19993/30/1999 12:00:00 AM NR
/ / 340 - CONF ONLY, TOLD TO GIVE SPECIFIC TIME FRAME FOR TEMP USE OF
BLD99-00101 INSP - Foundation3/29/19993/30/19993/30/1999 12:00:00 AMAPART
03/30/99 340 - ###-#### JOSH//FOOTING mti onsite, keep cn pending reports
BLD99-00121 INSP - Framing/Rough-in3/29/19993/30/19993/30/1999 12:00:00 AMAFAIL
03/30/99 340 - ###-#### MARK//CONFERENCE keep c/n, seal demising walls, recall w/ grid insp...wood door ok at bat
BLD99-00417 INSP - Framing/Rough-in3/29/19993/30/19993/30/1999 12:00:00 AMAPART
03/30/99 340 - ###-#### //CONFERENCE keep c/n
BLD98-03112 INSP - Framing/Rough-in3/26/19993/30/19993/30/1999 12:00:00 AMAFAIL
03/30/99 340 - ###-#### GEORGE//RI FRAMING storage units east side, nail sheathing at sills, add straps at butt jts
BLD98-03460 INSP - Framing/Rough-in3/29/19993/30/19993/30/1999 12:00:00 AMAPART
03/30/99 340 - ###-#### KELLY//MASONARY WALLS LATE AM nerth end east wall onlt 3rd lift ok
BLD98-03926 INSP - Final3/29/19993/30/19993/30/1999 12:00:00 AMAFAIL
03/30/99 340 - ###-#### CAROL//FINAL c/n, smokes., landing, air seal, exposed visqueen, etc.
BLD98-03952 INSP - Concrete3/29/19993/30/19993/30/1999 12:00:00 AMPFAIL
03/30/99 340 - need to verify concrete w/ this permit; this bldg is adja
BLD98-03952 INSP - Final3/30/19993/30/19993/30/1999 12:00:00 AMPFAIL
03/30/99 340 - ###-#### DAVE//FINAL CALL B4 GOING TO MEET YOU c/n: landings, ramp, fire,ADA at door 2, need as builts.
BLD99-00030 INSP - Final3/29/19993/30/19993/30/1999 12:00:00 AMPFAIL
03/30/99 340 - ###-#### MIKE//FINAL has htg cn, etc. no further insp
BLD98-00158 INSP - Final3/29/19993/30/19993/30/1999 12:00:00 AMPPASS
03/30/99 340 - Scheduled by Hello!. Contact phone is [3753000]. ok to sign card
BLD98-01822 INSP - Foundation3/29/19993/30/19993/30/1999 12:00:00 AMPPART
03/30/99 340 - ###-#### HARVEY//FOOTING rec'd engs letter for 2500# concrete, no spec insp; ftgs ok to pour
BLD98-02202 INSP - Final3/30/19993/30/19993/30/1999 12:00:00 AMPPART
03/30/99 340 - ###-#### struct ok for perm occ, has fee due???
BLD99-00496 INSP - Framing/Rough-in3/30/19993/30/19993/30/1999 12:00:00 AMPPART
03/30/99 340 - rein ###-#### ok to cover
BLD99-00496 INSP - Framing/Rough-in3/30/19993/30/19993/30/1999 12:00:00 AMPPART
03/30/99 340 - 601 n Phillippi ###-#### gary cn, seal penetrations, ok to continue
MEC99-00659 INSP - Final3/30/19993/30/19993/30/1999 12:00:00 AMPPASS
03/30/99 340 - ###-#### STEVE//FINAL REINSPECTION
MEC99-00659 INSP - Final3/30/19993/30/19993/30/1999 12:00:00 AMPPASS
03/30/99 340 - ###-#### STEVE//FINAL REINSPECTION