Inspections for the day of: Thursday, March 30, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00502 BLD-Foundation3/29/20003/30/20003/30/2000 12:00:00 AMAPASS
after 10 am ###-####
BLD99-02817 BLD-Final3/29/20003/30/20003/30/2000 12:00:00 AMAPASS
Bill ###-####
BLD00-00483 BLD-Framing/Rough-in3/29/20003/30/20003/30/2000 12:00:00 AMAFAIL
###-#### C/N posted. 3/30/00 2:19:55 PM
MEC00-00994 Rough-in3/29/20003/30/20003/30/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/29/2000 at 22:04:52. Contact: ###-####.
MEC00-00995 Rough-in3/29/20003/30/20003/30/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/29/2000 at 22:05:56. Contact: ###-####.
MEC99-04152 Conference3/30/20003/30/20003/30/2000 12:00:00 AMAPART
10" combustion air to be taken from attic, terminating as close as possible to gable vent
BLD00-00384 BLD-Energy code compliance3/30/20003/30/20003/30/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/30/2000 at 08:33:43. Contact: ###-####. Deck specifications, need more information, letter from manf. not approved. 3/31/00 11:40:59 AM
BLD99-01095 BLD-Final3/30/20003/30/20003/30/2000 12:00:00 AMPFAIL
###-####
BLD99-03593 BLD-Framing/Rough-in3/29/20003/30/20003/30/2000 12:00:00 AMPPASS
###-####
BLD99-03593 BLD-Energy code compliance3/29/20003/30/20003/30/2000 12:00:00 AMPPASS
###-####
BLD99-03699 BLD-Framing/Rough-in3/29/20003/30/20003/30/2000 12:00:00 AMPPART
###-#### call first to meet Stairs not done. 3/31/00 11:40:33 AM