PLM01-00907
| Sprinkler (Final) | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-00810
| Water and/or Sewer | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | FAIL |
|
|
Marie ###-#### no corrections made 3/30/2001 3:33:06 PM
|
PLM01-00908
| Water and/or Sewer | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PASS |
|
|
john-- ###-#### swr & water
|
PLM01-00909
| Water and/or Sewer | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PASS |
|
|
john ###-#### swr & water
|
PLM01-00397
| Final | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 12:47:50. Contact: ###-####. ground floor restrooms ok still need janior sink and d.f. completions 3/30/2001 10:12:38 AM
|
PLM01-00835
| Plumbing Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 15:38:19. Contact: ###-####.
|
PLM01-00462
| Other | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 330 On 3/30/2001 9:15:32 AM condensate into lav tailpiece ok
|
PLM00-04403
| Roof Drains | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 09:10:22. Contact: ###-####. replace abs piping within the interceptor with material approved for use with petroleum products, last 5 rd and of ok 3/30/2001 2:48:25 PM
|
PLM01-00212
| Final | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 09:35:04. Contact: ###-####. rp required on all 3 juice mechines, provide power and collection resivour for grease trap, ice bin drain may not connect to other waste pipes. 3/30/2001 10:39:15 AM
|
PLM01-00568
| Plumbing Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | PASS |
|
|
GENE ###-#### R/I
|
PLM01-00487
| Plumbing Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | PASS |
|
|
GENE ###-#### --R/I
|
PLM01-00462
| Final | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 08:25:03. Contact: ###-####. this is a conference 3/30/2001 9:00:06 AM
|