ELE01-00068
| Electrical Rough-In | 3/28/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PART |
|
|
Peter Watts ###-#### home ###-#### conference. residential remodel branch circuits. 3/30/2001 11:24:39 AM
|
ELE00-03668
| Final | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | FAIL |
|
|
###-####. nec: 410-4: shower light/fan not approved for wet locations. 3/30/2001 9:46:55 AM
|
ELE01-00485
| Electrical Rough-In | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PART |
|
|
northend offices and corridor ele r/i. ok. 3/29/2001 3:27:31 PM
|
ELE01-00991
| Electrical Rough-In | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PART |
|
|
###-#### CONFERENCE Marty call first . conference; meter/main service change; code requirements.. 3/30/2001 10:40:09 AM
|
ELE01-01002
| Rough-In Permanent Service | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PART |
|
|
###-####. ele r/i only, service not at this time. 3/30/2001 9:12:27 AM
|
ELE01-00440
| Final | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PASS |
|
|
###-#### BILL FN . completed. ok. 3/30/2001 9:13:00 AM
|
ELE01-00897
| Final | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 22:38:23. Contact: ###-####. installed light fixtures under canopy. 3/30/2001 11:43:21 AM
|
ELE98-03567
| Electrical Rough-In | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | FAIL |
|
|
###-####. 4th floor: ceiling tiles installed before ceiling inspection. informed contractor to have removed for reinspection. 3/30/2001 2:32:08 PM
|
ELE01-00711
| Electrical Rough-In | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 09:10:13. Contact: ###-####. 3/30/2001 3:25:55 PM. ceiling r/i; corrections completed, ok. 3/30/2001 4:07:48 PM
|
ELE01-00445
| Final | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | FAIL |
|
|
John ###-####. NEC; 210-52. recepticles required within 6ft of opening. (kitchen), inoperative recepticle in great room. called contractor. 3/30/2001 2:01:57 PM
|
ELE00-01971
| Final | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 12:58:53. Contact: ###-####. shell and core completed. ok. 3/30/2001 3:23:39 PM
|
ELE01-00982
| Final | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | NH |
|
|
spa\\###-####. no access; left card, called contractor to reschedule. 3/30/2001 3:40:16 PM
|