Inspections for the day of: Friday, March 30, 2001.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMarv Burrus
TitleELE
Phone #340-1297
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE01-00068 Electrical Rough-In3/28/20013/30/20013/30/2001 12:00:00 AMAPART
Peter Watts ###-#### home ###-#### conference. residential remodel branch circuits. 3/30/2001 11:24:39 AM
ELE00-03668 Final3/29/20013/30/20013/30/2001 12:00:00 AMAFAIL
###-####. nec: 410-4: shower light/fan not approved for wet locations. 3/30/2001 9:46:55 AM
ELE01-00485 Electrical Rough-In3/29/20013/30/20013/30/2001 12:00:00 AMAPART
northend offices and corridor ele r/i. ok. 3/29/2001 3:27:31 PM
ELE01-00991 Electrical Rough-In3/29/20013/30/20013/30/2001 12:00:00 AMAPART
###-#### CONFERENCE Marty call first . conference; meter/main service change; code requirements.. 3/30/2001 10:40:09 AM
ELE01-01002 Rough-In Permanent Service3/29/20013/30/20013/30/2001 12:00:00 AMAPART
###-####. ele r/i only, service not at this time. 3/30/2001 9:12:27 AM
ELE01-00440 Final3/29/20013/30/20013/30/2001 12:00:00 AMAPASS
###-#### BILL FN . completed. ok. 3/30/2001 9:13:00 AM
ELE01-00897 Final3/29/20013/30/20013/30/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/29/2001 at 22:38:23. Contact: ###-####. installed light fixtures under canopy. 3/30/2001 11:43:21 AM
ELE98-03567 Electrical Rough-In3/30/20013/30/20013/30/2001 12:00:00 AMPFAIL
###-####. 4th floor: ceiling tiles installed before ceiling inspection. informed contractor to have removed for reinspection. 3/30/2001 2:32:08 PM
ELE01-00711 Electrical Rough-In3/30/20013/30/20013/30/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/30/2001 at 09:10:13. Contact: ###-####. 3/30/2001 3:25:55 PM. ceiling r/i; corrections completed, ok. 3/30/2001 4:07:48 PM
ELE01-00445 Final3/30/20013/30/20013/30/2001 12:00:00 AMPFAIL
John ###-####. NEC; 210-52. recepticles required within 6ft of opening. (kitchen), inoperative recepticle in great room. called contractor. 3/30/2001 2:01:57 PM
ELE00-01971 Final3/29/20013/30/20013/30/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/29/2001 at 12:58:53. Contact: ###-####. shell and core completed. ok. 3/30/2001 3:23:39 PM
ELE01-00982 Final3/29/20013/30/20013/30/2001 12:00:00 AMPNH
spa\\###-####. no access; left card, called contractor to reschedule. 3/30/2001 3:40:16 PM