BLD01-00023
| BLD-Final | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00638
| BLD-Footing | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 19:20:15. Contact: ###-####.wip 3/30/2001 12:21:33 PM
|
BLD00-03550
| BLD-Footing | 3/28/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PART |
|
|
George ###-####Requested engineering or removal of 4 " electrical condiut at nw corner of building. ok to pour remainer of formed footing. 3/30/2001 11:59:07 AM
|
BLD00-03236
| BLD-Energy code compliance | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PART |
|
|
Energy report needed prior to final. 3/30/2001 10:57:21 AM
|
BLD00-03236
| BLD-Framing/Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PASS |
|
|
###-#### Prior c/n corrections verified; engineering supplied. 3/30/2001 10:57:58 AM
|
BLD00-02226
| BLD-Final | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | FAIL |
|
|
Larry ###-#### C/N Prior c/n items not corrected. 3/30/2001 9:29:45 AM
|
BLD00-03565
| BLD-Final | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 14:55:15. Contact: ###-####. C. of C. #21416 issued. 3/30/2001 8:29:58 AM
|
BLD01-00258
| BLD-Framing/Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PASS |
|
|
SHEAR-- SHAWN-- ###-####
|
BLD00-03674
| BLD-Wall cover | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 15:57:06. Contact: ###-####. Completion of new anchor bolts per prior c/n verified. 3/30/2001 11:10:52 AM
|
BLD01-00506
| BLD-Wall cover | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | FAIL |
|
|
###-#### shear C/N posted--additional fastening of shear panels required per approved plans--inspector marked with black crayon.--Do not side. 3/30/2001 3:52:00 PM
|
BLD99-03673
| BLD-Final | 3/28/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 03/28/2001 at 10:13:22. Contact: ###-####. All required sign-offs not done-will reschedule. 3/30/2001 12:41:34 PM
|
MEC01-00929
| Final | 3/29/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 15:54:48. Contact: ###-####.
|
MEC01-00937
| Rough-in | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC01-00937
| Pressure Test | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | PASS |
|
|
|
MEC01-00462
| Final | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 08:11:37. Contact: ###-####. C/N issued-not ready--range hood/jenn air w/ duct not installed at time of inspection. 3/30/2001 2:11:18 PM
|
BLD01-00033
| BLD-Framing/Rough-in | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | FAIL |
|
|
###-#### C/n posted--wires need attention--wraps per code. elec. and mechanical approval to cover. 3/30/2001 3:14:09 PM
|
MEC00-00934
| Pressure Test | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 09:00:32. Contact: ###-####.
|
MEC00-00934
| Final | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 09:00:59. Contact: ###-####.No access--called contact --they did not call in for an inspection. 3/30/2001 2:26:13 PM
|
BLD00-01896
| BLD-Final | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | PASS |
|
|
fn occ- jay ###-#### C. of C #21068 3/30/2001 1:16:15 PM
|
BLD00-02226
| BLD-Final | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | PASS |
|
|
FN OCC-- ###-####- TODD c. fo c. #21417 issued. 3/30/2001 1:49:48 PM
|
BLD01-00378
| BLD-Framing/Rough-in | 3/30/2001 | 3/30/2001 | 3/30/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 10:51:17. Contact: ###-####.Prior c/n items corrected--SHEAR 3/30/2001 12:40:55 PM
|