Inspections for the day of: Friday, March 30, 2001.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00023 BLD-Final3/29/20013/30/20013/30/2001 12:00:00 AMAPASS
###-####
BLD01-00638 BLD-Footing3/29/20013/30/20013/30/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/29/2001 at 19:20:15. Contact: ###-####.wip 3/30/2001 12:21:33 PM
BLD00-03550 BLD-Footing3/28/20013/30/20013/30/2001 12:00:00 AMAPART
George ###-####Requested engineering or removal of 4 " electrical condiut at nw corner of building. ok to pour remainer of formed footing. 3/30/2001 11:59:07 AM
BLD00-03236 BLD-Energy code compliance3/29/20013/30/20013/30/2001 12:00:00 AMAPART
Energy report needed prior to final. 3/30/2001 10:57:21 AM
BLD00-03236 BLD-Framing/Rough-in3/29/20013/30/20013/30/2001 12:00:00 AMAPASS
###-#### Prior c/n corrections verified; engineering supplied. 3/30/2001 10:57:58 AM
BLD00-02226 BLD-Final3/29/20013/30/20013/30/2001 12:00:00 AMAFAIL
Larry ###-#### C/N Prior c/n items not corrected. 3/30/2001 9:29:45 AM
BLD00-03565 BLD-Final3/29/20013/30/20013/30/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/29/2001 at 14:55:15. Contact: ###-####. C. of C. #21416 issued. 3/30/2001 8:29:58 AM
BLD01-00258 BLD-Framing/Rough-in3/29/20013/30/20013/30/2001 12:00:00 AMAPASS
SHEAR-- SHAWN-- ###-####
BLD00-03674 BLD-Wall cover3/29/20013/30/20013/30/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/29/2001 at 15:57:06. Contact: ###-####. Completion of new anchor bolts per prior c/n verified. 3/30/2001 11:10:52 AM
BLD01-00506 BLD-Wall cover3/29/20013/30/20013/30/2001 12:00:00 AMPFAIL
###-#### shear C/N posted--additional fastening of shear panels required per approved plans--inspector marked with black crayon.--Do not side. 3/30/2001 3:52:00 PM
BLD99-03673 BLD-Final3/28/20013/30/20013/30/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 03/28/2001 at 10:13:22. Contact: ###-####. All required sign-offs not done-will reschedule. 3/30/2001 12:41:34 PM
MEC01-00929 Final3/29/20013/30/20013/30/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/29/2001 at 15:54:48. Contact: ###-####.
MEC01-00937 Rough-in3/30/20013/30/20013/30/2001 12:00:00 AMPPASS
###-####
MEC01-00937 Pressure Test3/30/20013/30/20013/30/2001 12:00:00 AMPPASS
MEC01-00462 Final3/30/20013/30/20013/30/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/30/2001 at 08:11:37. Contact: ###-####. C/N issued-not ready--range hood/jenn air w/ duct not installed at time of inspection. 3/30/2001 2:11:18 PM
BLD01-00033 BLD-Framing/Rough-in3/30/20013/30/20013/30/2001 12:00:00 AMPFAIL
###-#### C/n posted--wires need attention--wraps per code. elec. and mechanical approval to cover. 3/30/2001 3:14:09 PM
MEC00-00934 Pressure Test3/30/20013/30/20013/30/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 03/30/2001 at 09:00:32. Contact: ###-####.
MEC00-00934 Final3/30/20013/30/20013/30/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 03/30/2001 at 09:00:59. Contact: ###-####.No access--called contact --they did not call in for an inspection. 3/30/2001 2:26:13 PM
BLD00-01896 BLD-Final3/30/20013/30/20013/30/2001 12:00:00 AMPPASS
fn occ- jay ###-#### C. of C #21068 3/30/2001 1:16:15 PM
BLD00-02226 BLD-Final3/30/20013/30/20013/30/2001 12:00:00 AMPPASS
FN OCC-- ###-####- TODD c. fo c. #21417 issued. 3/30/2001 1:49:48 PM
BLD01-00378 BLD-Framing/Rough-in3/30/20013/30/20013/30/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/30/2001 at 10:51:17. Contact: ###-####.Prior c/n items corrected--SHEAR 3/30/2001 12:40:55 PM