Inspections for the day of: Tuesday, March 30, 2004.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC03-01106 BMP Violation3/26/20043/30/20043/30/2004 12:00:00 AMACANC
ESC03-01106 BMP Violation3/26/20043/30/20043/30/2004 12:00:00 AMAPART
Cleanup of dirt from sidewalk, street completed. Silt fence ok to be installed by the end of the day on 3/31/04. Will follow up 3/30/2004 3:10:41 PM
ESC02-00559 Site Final3/29/20043/30/20043/30/2004 12:00:00 AMAPART
Structual bmp iinstalled on downslope on part of the hillside. 3/30/2004 3:09:21 PM
ESC04-00259 Site Preparation3/30/20043/30/20043/30/2004 12:00:00 AMAPASS
ESC04-00201 Site Preparation3/30/20043/30/20043/30/2004 12:00:00 AMAFAIL
Verbal correction to rp. ###-####. Complete by the end of today. Sweep dirt, protect d.inlets. 3/31/2004 8:20:52 AM
ESC04-00221 Site Preparation3/30/20043/30/20043/30/2004 12:00:00 AMAPART
Informed RP P. Palmer ###-#### to remove dirt from sidewalk/curb and that concrete clean out debris was done unacceptable, correct by transfering to inside the garage not right behind sidewalk. 3/30/2004 8:34:52 AM
ESC03-01642 Site Preparation3/30/20043/30/20043/30/2004 12:00:00 AMAPASS
Stop work lifted. Ok to proceed--permits have been issued. Informed RP that additional work is needed on construction entrance, parking area and to ensure all d.inlets on cloverdale and mcillian are protected. Will follow up. 3/30/2004 9:18:30 AM
ESC04-00102 Site Preparation3/30/20043/30/20043/30/2004 12:00:00 AMAPASS
ESC04-00029 Site Preparation3/30/20043/30/20043/30/2004 12:00:00 AMAPASS
ESC04-00028 Site Preparation3/30/20043/30/20043/30/2004 12:00:00 AMAPASS
ESC03-01645 Conference3/30/20043/30/20043/30/2004 12:00:00 AMADONE
No work observed-demo of structure completed, no dirt trackout but no rp was listed on permit. Will follow up.. 3/30/2004 11:08:54 AM
ESC03-01278 Tracking Control3/30/20043/30/20043/30/2004 12:00:00 AMPFAIL
Compliant--Called RP, meet on site. Informed
RP to remove dirt and sweep street, curb and sidewalk. Provided a ESC sign and advised it be installed on job site. Complete bmp's and tracking clean up by end of the day of 3/31/04. Will follow up. 3/30/2004 3:08:15 PM