Inspections for the day of: Tuesday, March 30, 2004.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy James
TitleMEC-COM/RES INSPECTOR
Phone #794-9461
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC03-03010 Final3/29/20043/30/20043/30/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 3/29/2004 at 12:03:17 PM. Contact: ###-####.
MEC04-00667 Rough-in3/29/20043/30/20043/30/2004 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Mya Matheson
MEC04-00515 Final3/29/20043/30/20043/30/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 3/29/2004 at 2:43:15 PM. Contact: ###-####. Provide 6" clearance to single wall connector aboved water heater. 3/30/2004 11:38:05 AM
MEC03-03199 Conference3/29/20043/30/20043/30/2004 12:00:00 AMAPASS
these should be doc finaled get on these inspections see ya. linda Internet Inspection Request from: Richard Reppert
MEC04-00802 Final3/29/20043/30/20043/30/2004 12:00:00 AMPPASS
Please inspect as late as possible. Call with any problems. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC04-00807 Final3/30/20043/30/20043/30/2004 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: Darla Downs
MEC04-00791 Rough-in3/30/20043/30/20043/30/2004 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 3/30/2004 at 9:30:04 AM. Contact: ###-####. Still need 1" clearance to b-vent at floor. See stud wall next to b-vent at second level. 3/30/2004 2:35:41 PM
MEC03-03036 Final3/30/20043/30/20043/30/2004 12:00:00 AMPPASS
Please call drew at ###-#### 1/2 hour prior; Phone #: ###-#### Internet Inspection Request from: Sherri Petterson