FIR04-00743
| FIR-Aging Inspection | 3/30/2005 | 3/30/2005 | 3/30/2005 12:00:00 AM | | NR |
|
|
Project was on hold until general contractor returns at the first of April 3/30/2005 12:58:33 PM
|
MIS04-00325
| MIS-Aging Inspection | 3/30/2005 | 3/30/2005 | 3/30/2005 12:00:00 AM | | NR |
|
|
Per Keith at ###-#### items still need correcting. He will address immediately. 3/30/2005 2:58:30 PM
|
BLD04-01847
| FIRE-Final Inspection | 3/25/2005 | 3/30/2005 | 3/30/2005 12:00:00 AM | A | PASS |
|
|
Fire life safety finaled 3/30/2005 9:53:56 AM
|
FIR05-00131
| INSP-Final Inspection | 3/25/2005 | 3/30/2005 | 3/30/2005 12:00:00 AM | A | CANC |
|
|
This si Grants Cell; Phone #: ###-#### Internet Inspection Request from: Terry Owsley
|
BLD04-02239
| FIRE-Final Inspection | 3/29/2005 | 3/30/2005 | 3/30/2005 12:00:00 AM | A | FAIL |
|
|
###-#### The relocated smoke detector in the basement did not operate and according to Alarmco the fire alarm panel has not contacted the monitoring company since Monday the 28th of March. The building manintenance guy has been notified 3/30/2005 9:53:14 AM
|
BLD04-02330
| FIRE-Final Inspection | 3/29/2005 | 3/30/2005 | 3/30/2005 12:00:00 AM | A | PASS |
|
|
Fire life finaled 3/30/2005 10:13:29 AM
|
FIR05-00134
| INSP-Final Inspection | 3/30/2005 | 3/30/2005 | 3/30/2005 12:00:00 AM | P | FAIL |
|
|
Duct smoke detectors did not shut down hvac units. Need correct orfice in the inspectors test for proper testing. Provide knox key box per review note#10. Mount map at facp. Duct smoke detector zone is showing as vault alarm at the monitoring service. 3/30/2005 4:49:45 PM
|
FIR04-00769
| INSP-Final Inspection | 3/30/2005 | 3/30/2005 | 3/30/2005 12:00:00 AM | P | FAIL |
|
|
Some audio/visuals are mounted too high. See review note #11. Provide panel schedule in breaker box with lock for breaker. Provide signage on the fire riser door per review note #18. Provide as-builts per review note #1. 3/30/2005 2:52:27 PM
|
FIR04-00800
| INSP-Final Inspection | 3/30/2005 | 3/30/2005 | 3/30/2005 12:00:00 AM | P | FAIL |
|
|
Racks are blocking visuals. Need to resubmit accounting for obstructions to strobe coverage. 3/30/2005 1:01:00 PM
|
FIR04-00643
| INSP-Supply line flush | 3/30/2005 | 3/30/2005 | 3/30/2005 12:00:00 AM | P | PASS |
|
|
Underground supply line flush passed 3/30/2005 3:12:24 PM
|
BLD04-01997
| FIRE-Final Inspection | 3/30/2005 | 3/30/2005 | 3/30/2005 12:00:00 AM | P | FAIL |
|
|
Wrong plans on site. Floor plans do not match what is built
|
BLD05-00045
| FIRE-Final Inspection | 3/30/2005 | 3/30/2005 | 3/30/2005 12:00:00 AM | P | CANC |
|
|
Fire life safety finaled. Ray, the general contractor verified CFM rating is below 2000 CFM, therfore duct detectors are not required.
|