MEC06-00947
| Pressure Test | 3/28/2006 | 3/30/2006 | 3/30/2006 4:54:40 PM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: DeAnna Barrett...20lb test ok
|
MEC06-00947
| Rough-in | 3/28/2006 | 3/30/2006 | 3/30/2006 4:53:58 PM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: DeAnna Barrett
|
MEC06-00952
| Final | 3/30/2006 | 3/30/2006 | 3/30/2006 4:14:44 PM | P | PASS |
|
|
###-####
|
MEC06-00952
| Rough-in | 3/30/2006 | 3/30/2006 | 3/30/2006 4:13:59 PM | P | PASS |
|
|
Please inspect as late as possible. The furnace is ready for a final, but cooktop and hood are not so I wasn't sure if I needed to call this in as a rough or final.:); Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
MEC06-00952
| Pressure Test | 3/30/2006 | 3/30/2006 | 3/30/2006 4:13:15 PM | P | PASS |
|
|
Please inspect as late as possible. Call with any problems. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
MEC06-00544
| Final | 3/30/2006 | 3/30/2006 | 3/30/2006 12:26:51 PM | A | FAIL |
|
|
Call Patti with any questions; Phone #: -###-#### x202 Internet Inspection Request from: Sickles Cassi...this should have been a r/i and pressure test
|
MEC06-00929
| Pressure Test | 3/29/2006 | 3/30/2006 | 3/30/2006 12:25:22 PM | A | PASS |
|
|
Air Care -- rough in and gas test; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
MEC06-00929
| Rough-in | 3/29/2006 | 3/30/2006 | 3/30/2006 10:30:14 AM | A | PASS |
|
|
Air Care -- rough in and gas test; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
MEC05-03312
| Final | 3/29/2006 | 3/30/2006 | 3/30/2006 9:48:45 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 3/29/2006 at 3:51:27 PM. Contact: ###-####.
|