ELE06-01054
| Rough-In Permanent Service | 3/30/2006 | 3/30/2006 | 3/30/2006 4:51:25 PM | P | FAIL |
|
|
Tim -- reinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong still needs to have 8' clearence over structure.
|
ELE06-01016
| Permanent Service | 3/30/2006 | 3/30/2006 | 3/30/2006 4:31:44 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/30/2006 at 9:44:59 AM. Contact: ###-####. p/s o/h reconnect ok
|
ELE06-00701
| Final | 3/30/2006 | 3/30/2006 | 3/30/2006 3:35:57 PM | P | PART |
|
|
NEED FINAL INSPECTION ON WIRE ADDITION. THANK YOU; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH bedroom-bathroom ok, still need to inspect master closet-kitchen area.
|
ELE06-00906
| Final | 3/30/2006 | 3/30/2006 | 3/30/2006 2:24:40 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Dana Moyer
|
ELE06-00897
| Rough-In Permanent Service | 3/29/2006 | 3/30/2006 | 3/30/2006 1:23:20 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/29/2006 at 2:26:32 PM. Contact: ###-####. ri ok p/s u/g n ok
|