Inspections for the day of: Monday, March 30, 2009.
Number of inspections: 12
Percentage of inspections complete: 92 %
Percentage of inspections not complete: 8 %
Contact Information
InspectorEric Strole
TitlePLM/MEC-INSPECTOR
Phone #794-7913
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS09-00048 PLM-Conference3/26/20093/26/2009 P 
PLM09-00429 Final3/30/20093/30/20093/30/2009 4:44:08 PMPPASS
should be ready around 3:30, call mile before going out please at ###-####. thanks! Phone #: ###-#### Internet Inspection Request from: Kelea Dunne
PLM07-03874 Water and/or Sewer3/27/20093/30/20093/30/2009 4:12:02 PMPFAIL
Phone #: ###-#### Internet Inspection Request from: Kerrie Simpson-need air gap on softner drain.
PLM08-01408 DOC - Permit Finaled3/30/20093/30/20093/30/2009 4:11:09 PMPPASS
PLM08-01408 Water and/or Sewer3/27/20093/30/20093/30/2009 3:33:57 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Kerrie Simpson
ESC09-00060 Site Preparation3/30/20093/30/20093/30/2009 3:25:22 PM PASS
PLM09-00079 Final3/30/20093/30/20093/30/2009 3:22:35 PMPPART
need to pipe vacuum per nfpa. need cert papers from norco on vacuum & air. temp final ok.
PLM09-00427 Plumbing Rough-in3/30/20093/30/20093/30/2009 3:20:31 PMPPART
Bob Phone #: 230-0-trunk line ok to cover, still need all branch drains.
PLM09-00423 Plumbing Rough-in3/30/20093/30/20093/30/2009 3:12:17 PMPPART
Bob Phone #: ###-####
MEC09-00650 Conference3/30/20093/30/20093/30/2009 11:47:07 AMADONE
training with dixie
PLM09-00079 Final3/30/20093/30/20093/30/2009 11:45:34 AMPPEND
darrin Phone #: ###-####-need to meet bill v. on vac system.
ESC09-00098 General Inspection3/30/20093/30/20093/30/2009 10:45:58 AMAPART
eric requested an inspection-corrections are complete except concrete washout pit , pit will be cleaned out by 3-31-09 as per conversation with rp. will reinspect on 3-31-09.