Inspections for the day of: Monday, March 30, 2009.
Number of inspections: 9
Percentage of inspections complete: 89 %
Percentage of inspections not complete: 11 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00255 INSP-Final Inspection3/27/20093/27/2009 P 
Contact Rafe Phone#: ###-####
FIR08-00766 INSP-Supply line flush3/27/20093/30/20093/30/2009 3:55:35 PMPPART
See initials on plans for the last riser supply lead-in flush completed today serving the main building.
FIR09-00183 INSP-Final Inspection3/30/20093/30/20093/30/2009 3:50:33 PMPPASS
Scope of permit work field verified for completion, permit finaled.
BLD09-00080 FIRE-Conference3/30/20093/30/20093/30/2009 3:40:29 PMPDONE
On site visit regarding fire life safety conditions required for Occ.
BLD09-00359 FIRE-Conference3/27/20093/30/20093/30/2009 3:38:26 PMPDONE
On site conference regarding door hardware at the new storefront.
FIR08-00766 INSP-Sprinkler Rough-in3/30/20093/30/20093/30/2009 3:34:22 PMPFAIL
Thrust blocks at two 45 ells in the supply line to the SE detatched building are not of sufficient size or location, field changes in pipe routes must be shown on approved plans.
FIR08-00480 INSP-Final Inspection3/30/20093/30/20093/30/2009 3:30:45 PMAPASS
Items on correction notice have been completed, final fire sprinkler inspection passed.
FIR09-00135 INSP-Sprinkler Rough-in/Hydro3/30/20093/30/20093/30/2009 3:29:52 PMAPART
Overhead fire sprinkler system modifications at the new tenant are approved for cover.
FIR08-00766 INSP-Supply line flush3/27/20093/30/20093/30/2009 3:28:25 PMAPART
UG fire supply line flush for two east side riser lead-ins completed okay.