Inspections for the day of: Monday, March 30, 2009.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00119 Site Preparation3/23/20093/30/20093/31/2009 9:41:11 AMAPASS
ESC09-00045 Site Preparation3/30/20093/30/20093/31/2009 9:41:02 AM FAIL
Verbal to RP:
1. Protect the remaining storm drains with inlet protection on the perimeter storm drains.
2. Re-install both construction entrances with the proper rock.
Will re-inspect on 04/03/09AM.
ESC09-00125 General Inspection3/27/20093/30/20093/30/2009 3:13:56 PMADONE
Spoke with RP over the specifications of reaching a "PASS" of a site final inspection. Told them that he must stabilize all disturbed soil using an approved ground cover and or a sprayed product with a fast growing seed mix.
ESC08-00367 General Inspection ESC3/30/20093/30/20093/30/2009 1:43:14 PM DONE
Moved to a site final.
ESC08-00367 Site Final3/30/20093/30/20093/30/2009 1:43:09 PMPPASS
ESC09-00007 Site Preparation3/30/20093/30/20093/30/2009 1:42:30 PM NR
Will reinspect on 4/3/09AM.
ESC09-00122 Site Preparation3/24/20093/30/20093/30/2009 11:16:54 AMAPASS
ESC09-00075 BMP Violation3/27/20093/30/20093/30/2009 9:20:32 AMAPASS
ESC08-00924 General Inspection3/25/20093/30/20093/30/2009 8:34:00 AMAPASS
RP update.
ESC09-00133 Site Preparation3/30/20093/30/20093/30/2009 8:32:16 AM NR
Will re-inspect on 04/03/09AM