Inspections for the day of: Tuesday, March 30, 2010.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00096 INSP-Sprinkler Rough-in3/29/20103/30/20103/31/2010 8:12:34 AMAPART
The piping rough-in in general is passed. Trapeze hangers are required for the new 3" supply main since all of its weight is hanging from a single Z purlin and the earthquake bracing needs to be anchored at the beams as discussed with Roy. The overhead hydro test failed since a visable leak was found at a pendant and the 3" supply main had not been included in the test.
BLD09-02283 FIRE-Final Inspection3/29/20103/30/20103/30/2010 1:43:46 PMAPART
life safety passed
FIR10-00003 INSP-Final Inspection3/30/20103/30/20103/30/2010 1:38:56 PMPPASS
permit finaled
BLD09-02299 FIRE-Conference3/29/20103/30/20103/30/2010 12:57:13 PMADONE
I went over the life safety requirements which included the need for exit discharge lights, lever hardware on the new office door and mounting the front fire extinguisher at the cashiers counter.