Inspections for the day of: Tuesday, March 30, 2010.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-00042 Aging Inspection3/30/20103/30/20103/31/2010 3:55:35 PM DONE
ESC08-00566 General Inspection3/30/20103/30/20103/31/2010 9:41:48 AM DONE
ESC08-00630 General Inspection ESC3/30/20103/30/20103/30/2010 4:21:19 PM PASS
All work completed and sttabilized.
ESC08-00630 DOC - Permit Finaled3/30/20103/30/20103/30/2010 4:21:00 PMPPASS
ESC08-00658 General Inspection3/30/20103/30/20103/30/2010 3:33:29 PM DONE
Site was finalled out last week.
ESC08-00658 DOC - Permit Finaled3/30/20103/30/20103/30/2010 3:31:16 PMPPASS
ESC08-00649 General Inspection3/30/20103/30/20103/30/2010 3:30:06 PM DONE
Work completed.
ESC08-00649 DOC - Permit Finaled3/30/20103/30/20103/30/2010 3:30:05 PMPPASS
ESC08-00649 DOC - Permit Finaled3/30/20103/30/20103/30/2010 3:29:54 PMPPASS
ESC08-00559 General Inspection3/30/20103/30/20103/30/2010 3:02:48 PM DONE
ESC08-00559 DOC - Permit Finaled3/30/20103/30/20103/30/2010 3:02:09 PMPPASS
ESC08-00349 General Inspection3/30/20103/30/20103/30/2010 2:59:40 PM PASS
DOC finalled
ESC08-00349 DOC - Permit Finaled3/30/20103/30/20103/30/2010 2:59:28 PMPPASS
ESC06-01571 Aging Inspection3/30/20103/30/20103/30/2010 1:28:00 PM DONE
ESC06-01571 DOC - Permit Finaled3/30/20103/30/20103/30/2010 1:27:52 PMPPASS
ESC10-00128 Site Preparation3/24/20103/30/20103/30/2010 1:25:49 PMAPASS
ESC10-00197 BMP Violation3/30/20103/30/20103/30/2010 11:05:52 AMAFAIL
Verbal to Super (Larry):
Remove all storm drain protection the is external (Wattle Sections). The protection is not being maintained and is ripping apart and straw is pollutinfg the storm drain not allowing the "Witches Hats" to work correctly. Will re-inspect on 4/2/10.
ESC09-00356 Site Preparation3/25/20103/30/20103/30/2010 10:12:01 AMANR
ESC10-00183 Site Preparation3/30/20103/30/20103/30/2010 10:04:50 AM PASS
ESC10-00224 Site Preparation3/25/20103/30/20103/30/2010 9:44:24 AMAPASS
Met with RP and walked the project area. Keeping spoil pile away from the green belt and the have a curb as a sediment barrier. Also using wattle in areas where there is a gap in the curbs. D.I.s have been protected. Will re-inspect on 4/1/10
ESC09-00365 BMP Violation3/26/20103/30/20103/30/2010 9:22:11 AMAPART
Verbal to RP:
Stay up on general cleanup maintenance. Sweep up hard surface on a daily basis or during the day when sediment and debris on hard surfaces becomes excessive.