ESC09-00627
| Aging Inspection | 3/30/2011 | 3/30/2011 | 4/1/2011 7:42:50 AM | | CANC |
|
|
|
ESC09-00352
| General Inspection | 3/25/2011 | 3/30/2011 | 3/30/2011 3:21:43 PM | P | PART |
|
|
Verbal to RP, protection at lower end of Wellings is needed and final stabilzation is needed on bare ground at Wellings as well.
|
ESC10-00533
| General Inspection | 3/30/2011 | 3/30/2011 | 3/30/2011 2:35:58 PM | | PASS |
|
|
No problems observed, according to the course maintenance supervisor the parking lot is scheduled for paving in April and then re-vegeation of misc areas will occur.
|
ESC11-00163
| General Inspection | 3/30/2011 | 3/30/2011 | 3/30/2011 1:32:25 PM | | PART |
|
|
Verbal to RP, sign is posted at front of project. Need additional washed rock at entrances to reduce any possible tracking from dirt activities. Will follow up.
|