Inspections for the day of: Wednesday, March 30, 2011.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00456 Site Preparation3/28/20113/30/20113/31/2011 2:58:34 PMAPART
Verbal to RP:
Pull all storm drain inlet protection in the front portion of building after parking lot is swept. Keep the two storm drains in the back of building until all vegitative areas are stabilized.
ESC11-00050 BMP Violation3/30/20113/30/20113/30/2011 2:56:43 PMPFAIL
Verbal to RP:
Provide approved inlet protection on thestorm drain to the north of the staging area. Remove the protection on the upper section of the mall area where there is no construction impact at this time.
ESC10-00496 BMP Violation3/28/20113/30/20113/30/2011 10:20:00 AMAFAIL
Correction Notice still stands. Date of completion has been extend to 4/1/2011PM. Will re-inspect on 4/4/2011am
ESC10-00040 General Inspection3/30/20113/30/20113/30/2011 9:02:04 AM PART
They are plannig on hydro-seeding and have it complete by next week. Will re-inspect on 4/6/2011
ESC11-00027 General Inspection3/30/20113/30/20113/30/2011 8:28:28 AM NR
ESC11-00028 General Inspection3/30/20113/30/20113/30/2011 8:16:10 AM NR
ESC09-00681 Aging Inspection3/30/20113/30/20113/30/2011 8:11:07 AM DONE
PErmit Finaled. Verical work is attached to ESC10-00456
ESC09-00681 DOC - Permit Finaled3/30/20113/30/20113/30/2011 8:11:00 AMPPASS
ESC05-01900 Aging Inspection3/30/20113/30/20113/30/2011 7:58:44 AM DONE
Permit finalled.
ESC05-01900 DOC - Permit Finaled3/30/20113/30/20113/30/2011 7:58:26 AMPPASS