Inspections for the day of: Friday, March 30, 2012.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00076 Site Preparation3/30/20123/30/20123/30/2012 3:44:15 PM PASS
BLD11-01697 BLD-Other3/30/20123/30/20123/30/2012 3:28:00 PMPFAIL
ceilling grid insp. mech sign off/ support all defusers.
BLD12-00627 BLD-Final3/29/20123/30/20123/30/2012 2:45:38 PMPPASS
Linda Phone #: ###-#### OR ###-####
ESC12-00117 Random Inspection3/30/20123/30/20123/30/2012 2:28:39 PMPPASS
BLD12-00291 BLD-Energy code compliance3/30/20123/30/20123/30/2012 2:28:23 PMPPASS
bobby Phone #: ###-####
BLD12-00291 BLD-Framing/Rough-in3/30/20123/30/20123/30/2012 2:28:04 PMPPASS
bobby Phone #: ###-####
BLD11-02968 BLD-Conference3/30/20123/30/20123/30/2012 2:23:46 PMPFAIL
notafied framer of all 2nd floor windows facing sout must be fogged out per zonning
MIS12-00063 BLD-Conference3/30/20123/30/20123/30/2012 1:49:40 PMPFAIL
possible adding on the house with out a permit stop work posted
ESC12-00076 Random Inspection3/30/20123/30/20123/30/2012 1:47:40 PMPPASS
BLD12-00192 BLD-Footing3/29/20123/30/20123/30/2012 1:47:16 PMPPASS
Phone #: 2089410987 >> Inspection requested via mobile web by Bill
BLD12-00354 BLD-Final3/29/20123/30/20123/30/2012 1:46:23 PMPCANC
chris Phone #: ###-####
BLD12-00197 BLD-Final3/29/20123/30/20123/30/2012 1:17:24 PMPCANC
pm first thing w b poe arch
BLD11-01697 BLD-Other3/29/20123/30/20123/30/2012 10:19:30 AMANH
DAVE ###-#### no access
BLD12-00246 BLD-Final3/27/20123/30/20123/30/2012 9:45:39 AMADEFR
Bruce Poe Phone #: ###-####
BLD12-00197 BLD-Final3/27/20123/30/20123/30/2012 9:45:04 AMADEFR
Bruce Poe Phone #: ###-####