Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-00870 FIRE-Conference3/14/20123/28/2012 A 
Please check on this and let Barb @ permit desk know status-want to try to close out permit-Thanks
BLD12-00224 FIRE-Final Inspection3/30/20123/30/20123/30/2012 3:17:30 PMPPART
The life safety is passed for the two focus rooms located at the Break Room. The other two focus rooms that were shown to be built at the Lobby Entrance will not be built at this time. Plans need to be submitted showing this change to the scope of work prior to a full Life Safety Final.
FIR12-00120 INSP-Final Inspection3/30/20123/30/20123/30/2012 3:15:01 PMPPASS
Permit finaled.
BLD12-00221 FIRE-Final Inspection3/30/20123/30/20123/30/2012 2:23:49 PMPPASS
life safety passed
FIR12-00110 INSP-Final Inspection3/30/20123/30/20123/30/2012 2:23:11 PMPPASS
Permit finaled
BLD12-00221 FIRE-Final Inspection3/29/20123/30/20123/30/2012 12:58:22 PMAFAIL
Provide exit discharge lighting at the rear exit door.
FIR12-00120 INSP-Sprinkler Rough-in/Hydro3/29/20123/30/20123/30/2012 11:03:50 AMAPASS
Hydro test passed for the Ulta Beauty space/system.
FIR12-00054 INSP-Final Inspection3/29/20123/30/20123/30/2012 10:58:08 AMAPASS
permit finaled
FIR12-00071 INSP-Final Inspection3/29/20123/30/20123/30/2012 10:57:48 AMAPASS
Permit finaled