Inspections for the day of: Monday, March 30, 2015.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-01200 Site Preparation3/30/20153/30/20153/30/2015 3:20:18 PMPPASS
Site prep inspection requested by RP Greg with Petra ###-####

Norco headquarters expansion project is ready to begin. ESC permit posted on job trailer. Work is to connect the two buildings, some site demolition is required. Parking lot is paved and work area surrounded by asphalt so trackout should be easy to manage. Parking lot storm drains have sediment filter bags installed.

Approved.
ESC14-00281 Aging Inspection3/30/20153/30/20153/30/2015 2:50:56 PM PASS
Home is near completion and is currently being painted. The front yard has been landscaped, the backyard and alley parking area are still in progress. No trackout, spills, or discharges observed.
ESC13-00520 General Inspection3/30/20153/30/20153/30/2015 2:35:57 PM PART
Home construction complete, home is for sale and is landscaped but is not occupied. No activity. Bottum hillside is still establishing vegetation cover, which is why permit is open

Some minor rill erosion has occured on lower portion of yard due to irrigation water runoff from the sod area. Grading has been tracked horizontally and the silt fence BMP is containing sediment onsite and is properly installed. Site has been swept and materials cleaned.

Correction:
Rake out rills and reseed/stabilize as necessary
ESC14-00106 General Inspection3/30/20153/30/20153/30/2015 12:27:07 PM PASS
Requested that wattle be removed. Adajacent lot that was disturbed is now vegetated and stabilized. No other issues. RP Jeremy stated they would remove it this week.
ESC13-00344 DOC - Permit Finaled3/30/20153/30/20153/30/2015 12:13:17 PMPPASS
Boulder Heights #5 roads, stormwater ponds, and other infrastructure are complete. Central Paving/JH now working BH#6 which is permitted seperately.

Hillsides and disturbed areas have been vegetated and stabilized. ESC conditions satisfied.
ESC15-00094 General Inspection3/30/20153/30/20153/30/2015 12:06:52 PMPPASS
BH#5 in progress. Currently excavatiing and hauling dirt offsite. Construction entrance installed, permit and SWPPP on site. No trackout or discharges. Truck drivers moving slowly to keep dust down - no issues at time of inspection.
ESC14-00360 General Inspection3/30/20153/30/20153/30/2015 12:02:01 PM PASS
No activity or violations. Home is complete but needs landscaping and final stabilization.
ESC15-00035 Random Inspection3/30/20153/30/20153/30/2015 11:53:10 AMPPASS
Water truck is on site and in use to keep dust down at Parkcenter roundabout project. No trackout or fugitve dust at time of inspection.
ESC14-00144 Random Inspection3/30/20153/30/20153/30/2015 11:36:42 AMPPASS
Checked back on East Valley. No hauling is occuring, no dust, no trackout. Water truck was used for dust Friday afternoon as requested.
ESC14-01144 DOC - Permit Finaled3/30/20153/30/20153/30/2015 11:22:52 AMPPASS
Finishing touches on interior are near completion. Yard has been landscaped and stabilized. West Point street and new Wood River homes project are clean and currently in compliance. No further inspections necessary, ESC conditions satisfied.
ESC12-00842 Aging Inspection3/30/20153/30/20153/30/2015 11:12:06 AM PASS
Trailwinds sub has 5 townhomes currently in progress. Trash and materials are contained, no wind blown litter or debris. Wright Street sidewalks and gutters have minimal dirt.

Subdivsion BMPs (inlet protection, perimeter wattles) are installed. After landscaping the access alley should be swept.
ESC14-00300 General Inspection3/30/20153/30/20153/30/2015 10:47:33 AM PASS
Some work is still in progress, streets and gutters in auto mall are free of trackout & sediment. The drop inlets on Auto drive have sediment protection. No discharges, dust or other issues observed.
ESC12-01148 Aging Inspection3/30/20153/30/20153/30/2015 10:15:58 AM PASS
ESC14-00733 DOC - Permit Finaled3/30/20153/30/20153/30/2015 9:43:21 AMPPASS
ESC14-00733 Aging Inspection3/30/20153/30/20153/30/2015 9:43:01 AM PASS
New SFH complete, landscaped and disturbed area stabilized. Construction materials have been removed/cleaned. RH #5 homes currently in compliance.
ESC14-00237 DOC - Permit Finaled3/30/20153/30/20153/30/2015 9:13:16 AMPPASS
ESC14-00237 General Inspection3/30/20153/30/20153/30/2015 9:12:57 AM PASS
Picnic shelter complete. Landscaping and stabilization finaled. ESC permit conditions satisfied.