ESC15-00547
| General Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 4:47:40 PM | P | PASS |
|
|
WIP on aparment complex subdivision. Perimter sediment controls and trackout prevention are installed. No trackout, no discharges or sediment runoff onto sidewalks and gutter. Permit sign posted. No fugitive dust observed. Approved.
|
ESC15-00742
| Aging Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 3:54:09 PM | | PASS |
|
|
Project complete. All permits finaled. Temp. BMPs to be removed by Tahoe once all homes complete on the west side of East Valley Sub. No further ESC inspections on this permit.
|
ESC15-00742
| DOC - Permit Finaled | 3/30/2016 | 3/30/2016 | 3/30/2016 3:48:55 PM | P | PASS |
|
|
|
ESC15-00741
| Aging Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 3:48:46 PM | | PASS |
|
|
Project complete. All permits finaled. Temp. BMPs to be removed by Tahoe once all homes complete on the west side of East Valley Sub. No further ESC inspections on this permit.
|
ESC15-00741
| DOC - Permit Finaled | 3/30/2016 | 3/30/2016 | 3/30/2016 3:44:48 PM | P | PASS |
|
|
|
ESC15-00633
| Aging Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 3:40:56 PM | | PASS |
|
|
|
ESC15-00142
| General Inspection | 3/29/2016 | 3/30/2016 | 3/30/2016 3:01:01 PM | P | PASS |
|
|
No trackout. Permit sign posted on sidewalk. Apron and gutter were swept. No new corrections. New rock entrance will be installed when the haul out will occur.
|
ESC16-00184
| Random Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 2:40:57 PM | P | PASS |
|
|
WIP on frame. Small, flat infill site. No significant trackout. No corrections issued.
|
ESC15-00931
| General Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 2:39:47 PM | | PART |
|
|
WIP on interior. Some loose dirt in gutter, but DI bag installed and has capacity. RP will sweep up this week. No discharges, trackout, or spill stains observed. Trash contained.
|
ESC16-00228
| Site Preparation | 3/29/2016 | 3/30/2016 | 3/30/2016 2:31:53 PM | A | PASS |
|
|
Steve Phone #: ###-####
Permit sign posted. BMP of preserving existing vegetative berm and trees. No corrections. Just need to sweep up after finishing forms. No in close proximity of site, so no filter bag required at this time.
|
ESC15-01170
| DOC - Permit Finaled | 3/30/2016 | 3/30/2016 | 3/30/2016 2:12:58 PM | P | PASS |
|
|
|
ESC15-00221
| General Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 2:11:27 PM | | PASS |
|
|
Home near completion. Still need to finish driveway and front yard area. No excavated areas on the hillside or bachyard remain. No significant trackout. Will need to continue daily broom sweeping.
|
ESC15-00360
| General Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 12:29:07 PM | | PASS |
|
|
|
ESC16-00168
| Site Preparation | 3/29/2016 | 3/30/2016 | 3/30/2016 12:01:56 PM | A | PASS |
|
|
ESC & SWPPP sign posted. Rock construction entrance with geotextile lining is installed for site access off Victory.
Site is approved for 13.25 acres of disturbance, appropriate 404 permit has been approved to relocate the wetland area in the middle of the parcel to the northeast corner for mitigation. Wetland area is fed by Fivemile Creek (currently not flowing) which does convey irrigation water through site. A lined diversion ditch has been installed to diver the water flow around the wetland being filled, and eventually to the new wetland area.
Parcel owner and operator has CGPs filed (IDR12AD49 & IDR12AD62). Syman has prepared SWPPP and will help oversee initial BMP installment.
Soils from the graded area will be used to fill wetland area. The cut & fill is nearly balanced, so there will not be heavy truck traffic in and out of site.
Approved for construction. Will inspect next week to make sure diversion ditch is ready prior to irrigation water service starts for 2016.
|
ESC16-00419
| Site Preparation | 3/29/2016 | 3/30/2016 | 3/30/2016 11:54:30 AM | A | PASS |
|
|
Joe Phone #: ###-####
Permit sign posted in garage window. Work to occur in large backyard that has a stabilized access drive for contractor. Homeowner RP has leak-proof tubs provided for gunite washout containment. Reviewed permit conditions and housekeeping requirements.
Approved for construction.
|
ESC15-00210
| General Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 8:23:32 AM | | PASS |
|
|
SFH near completion, some work still in progress, including final landscaping. BLD open. No corrections at this time.
|