FIR16-00738 INSP-Sprinkler Rough-in/Hydro3/29/20173/30/20173/30/2017 3:29:25 PMPPART
See the city approved plans with notations in red for areas of the wet system and dry system inspected. I noted that I need access to the dog houses to verify insulation, sway bracing attachment needs to be verified. Tenting had been started but was not complete so all tenting will need to be verifed. Also the wet system remote area needs re-verified due to pipe routing changes near the closet area on the most remote line in the hydraulic calc. area.
FIR16-00810 INSP-Sprinkler Rough-in/Hydro3/30/20173/30/20173/30/2017 2:31:08 PMPPASS
Overhead hydro test passed
FIR16-00557 INSP-Sprinkler Rough-in3/30/20173/30/20173/30/2017 1:45:36 PMPPART
The sprinkler piping above both stairwells, on the second floor, is ok to cover. I noted that additional coverage may be required on the first floor at the bottom of the pole.
FIR16-00823 INSP-Sprinkler Rough-in3/29/20173/30/20173/30/2017 1:44:30 PMPPART
A rough to cover inspection passed for the building but piping can not be covered until a tenting inspection has been performed and the underground supply piping reroute has been approved.
FIR16-00824 INSP-Sprinkler Rough-in3/29/20173/30/20173/30/2017 1:43:20 PMPPART
Todays inspection was for the rough-in for the whole building. 90's are missing at the top and bottom of the second floor feed. The only areas where piping can be covered are in the upstairs apartments 201 and 202 since these were the only two which had tenting. Need resubmittals showing the underground supply piping being routed above ground to the new riser room.
FIR17-00090 INSP-Final Inspection3/29/20173/30/20173/30/2017 9:13:14 AMAPART
Sprinkler work is complete in the second floor south east corner office remodel. Waiting for the conference room/office area to be completed before a final is given.
BLD16-04597 FIRE-Final Inspection3/30/20173/30/20173/30/2017 9:12:40 AMAPART
Life safety passed in the second floor south east corner office remodel. Waiting for the conference room/office area to be completed before a final is given.
BLD16-03148 FIRE-Final Inspection3/29/20173/30/20173/30/2017 9:11:29 AMAFAIL
The fire extinguisher and exit sign has been corrected. It appears that the revised floor plan has not been submitted/approved. I discussed with Patrick Phone #: ###-####, the need to get this completed.
BLD16-01797 FIRE-Final Inspection3/29/20173/30/20173/30/2017 12:00:00 AMACANC