FIR16-00738
| INSP-Sprinkler Rough-in/Hydro | 3/29/2017 | 3/30/2017 | 3/30/2017 3:29:25 PM | P | PART |
|
|
See the city approved plans with notations in red for areas of the wet system and dry system inspected. I noted that I need access to the dog houses to verify insulation, sway bracing attachment needs to be verified. Tenting had been started but was not complete so all tenting will need to be verifed. Also the wet system remote area needs re-verified due to pipe routing changes near the closet area on the most remote line in the hydraulic calc. area.
|
FIR16-00810
| INSP-Sprinkler Rough-in/Hydro | 3/30/2017 | 3/30/2017 | 3/30/2017 2:31:08 PM | P | PASS |
|
|
Overhead hydro test passed
|
FIR16-00557
| INSP-Sprinkler Rough-in | 3/30/2017 | 3/30/2017 | 3/30/2017 1:45:36 PM | P | PART |
|
|
The sprinkler piping above both stairwells, on the second floor, is ok to cover. I noted that additional coverage may be required on the first floor at the bottom of the pole.
|
FIR16-00823
| INSP-Sprinkler Rough-in | 3/29/2017 | 3/30/2017 | 3/30/2017 1:44:30 PM | P | PART |
|
|
A rough to cover inspection passed for the building but piping can not be covered until a tenting inspection has been performed and the underground supply piping reroute has been approved.
|
FIR16-00824
| INSP-Sprinkler Rough-in | 3/29/2017 | 3/30/2017 | 3/30/2017 1:43:20 PM | P | PART |
|
|
Todays inspection was for the rough-in for the whole building. 90's are missing at the top and bottom of the second floor feed. The only areas where piping can be covered are in the upstairs apartments 201 and 202 since these were the only two which had tenting. Need resubmittals showing the underground supply piping being routed above ground to the new riser room.
|
FIR17-00090
| INSP-Final Inspection | 3/29/2017 | 3/30/2017 | 3/30/2017 9:13:14 AM | A | PART |
|
|
Sprinkler work is complete in the second floor south east corner office remodel. Waiting for the conference room/office area to be completed before a final is given.
|
BLD16-04597
| FIRE-Final Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 9:12:40 AM | A | PART |
|
|
Life safety passed in the second floor south east corner office remodel. Waiting for the conference room/office area to be completed before a final is given.
|
BLD16-03148
| FIRE-Final Inspection | 3/29/2017 | 3/30/2017 | 3/30/2017 9:11:29 AM | A | FAIL |
|
|
The fire extinguisher and exit sign has been corrected. It appears that the revised floor plan has not been submitted/approved. I discussed with Patrick Phone #: ###-####, the need to get this completed.
|
BLD16-01797
| FIRE-Final Inspection | 3/29/2017 | 3/30/2017 | 3/30/2017 12:00:00 AM | A | CANC |
|
|
Paul Phone #: ###-####
|