ELE20-00838
| Final | 3/29/2020 | 3/30/2020 | 3/30/2020 1:33:40 PM | P | PASS |
|
|
Inspect panel change-out.
* I will be there Thank you Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta...complete...ok to final
|
ELE20-00622
| Final | 3/30/2020 | 3/30/2020 | 3/30/2020 12:31:46 PM | P | PASS |
|
|
Graciela Phone #: ###-####...ok to final
|
ELE16-03205
| Final | 3/30/2020 | 3/30/2020 | 3/30/2020 11:40:20 AM | P | NR |
|
|
James Phone #: ###-####...not ready for final at this time...changed inspection to rough in
|
ELE16-03205
| Electrical Rough-In | 3/30/2020 | 3/30/2020 | 3/30/2020 11:37:39 AM | P | PASS |
|
|
James Phone #: ###-####...needed rough in inspection...wires ok to cover walls and ceiling..exterior outlets and lights and other interior lights need to be finished for final
|
ELE20-00907
| Final | 3/30/2020 | 3/30/2020 | 3/30/2020 10:55:17 AM | P | PASS |
|
|
Call to meet half hour before // Brian Phone #: ###-####...job complete...knob tube removed...new tamper resistant plugs and switches installed...GFCI recps where needed...ok to final
|
ELE20-00983
| Rough-In Permanent Service | 3/27/2020 | 3/30/2020 | 3/30/2020 10:40:22 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe... rough ok to cover p/s u/g new ok
|
ELE19-01489
| Final | 3/27/2020 | 3/30/2020 | 3/30/2020 10:18:36 AM | A | PART |
|
|
Final in Areas A and B. Jesse is the onsite contact. Phone #: ###-#### Inspection requested via web by Buster Bowen... Area A offices and classrooms Area B classrooms Area C library only
|
ELE20-01090
| Final | 3/27/2020 | 3/30/2020 | 3/30/2020 9:11:52 AM | A | PASS |
|
|
Working from home so please call a hour before so i can call to get access to the building from City of Boise contact and give me time to get to the site. Phone #: ###-#### Inspection requested via web by Jim Noll...interior cabinet locked and access to only maintenance personnel...new flourescernt lights with enclosed cover in building...added power in adjacent cabinet...ok to final
|