BLD18-03143
| BLD-Conference | 3/30/2020 | 3/30/2020 | 3/31/2020 7:36:59 AM | P | DONE |
|
|
Inspection walk. Adam Defining scope for todays walk. Call Adam when heading to site.
Putty Packs Insulation secondary Framing at bathrooms. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD18-03143
| BLD-Framing/Rough-in | 3/30/2020 | 3/30/2020 | 3/31/2020 7:36:36 AM | A | PART |
|
|
2nd floor shaft walls and insulation on Level 4 Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD19-02122
| BLD-Framing/Rough-in | 3/27/2020 | 3/30/2020 | 3/30/2020 10:58:21 AM | A | PART |
|
|
Please inspected the West side of the building framing. Call Andy when on site. Phone #: ###-#### Inspection requested via web by Andy Pense nw corner levels 2,3and 4 ok
|
BLD19-04535
| BLD-Framing/Rough-in | 3/27/2020 | 3/30/2020 | 3/30/2020 9:57:25 AM | A | PASS |
|
|
call ahead // Derik Phone #: ###-####
|
BLD19-04787
| BLD-Framing/Rough-in | 3/27/2020 | 3/30/2020 | 3/30/2020 9:22:41 AM | A | PART |
|
|
clint Phone #: ###-#### needs to add three headers over windows and install air seal package
|
BLD20-00760
| BLD-Foundation | 3/27/2020 | 3/30/2020 | 3/30/2020 8:53:39 AM | A | PASS |
|
|
tom Phone #: ###-####
|
BLD19-03440
| BLD-Energy code compliance | 3/27/2020 | 3/30/2020 | 3/30/2020 8:40:04 AM | A | NR |
|
|
Rick Phone #: ###-#### still working on c/n items
|
BLD19-04661
| BLD-Framing/Rough-in | 3/27/2020 | 3/30/2020 | 3/30/2020 7:50:39 AM | A | CANC |
|
|
Framing Inspection Phone #: ###-#### >> Inspection requested via web by Oleksiy Yanchuk Inspection cancelled from web by: Oleksiy Yanchuk
|
MIS20-00099
| BLD-Conference | 3/30/2020 | 3/30/2020 | | P | |
|
|
Phone #: ###-####
|