Inspections for the day of: Friday, March 31, 2006.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-03423 BLD-Final3/31/20063/31/20063/31/2006 4:32:28 PMPNR
trevor ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Life safety not passed. All life safety issues were repaired, Troy C was notified by me.
BLD05-02817 BLD-Final3/31/20063/31/20063/31/2006 4:31:04 PMPNR
trevor ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Needs code enforcement signoff and public works.
BLD04-03001 BLD-Final3/31/20063/31/20063/31/2006 3:19:58 PMPNR
Scheduled by a contractor via Hello! on 3/31/2006 at 11:02:09 AM. Contact: ###-####. still needs elec final.
BLD05-02413 BLD-Energy code compliance3/31/20063/31/20063/31/2006 3:07:43 PMPPASS
Internet Inspection Request from: paul thornton. All framing issues have been resolved.
BLD05-02759 BLD-Framing/Rough-in3/31/20063/31/20063/31/2006 2:26:47 PMPPART
DOUG; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Structural steel stud wall not complete, Still needs more strapping and blocking. remainder ok to cover pending elec. ri inspection.
BLD05-02685 BLD-Framing/Rough-in3/30/20063/31/20063/31/2006 11:46:34 AMAPART
Andy -- shearwall; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. 1st floor seperation wall, 5/8 type X, inner layer.
BLD05-02683 BLD-Framing/Rough-in3/30/20063/31/20063/31/2006 11:45:40 AMAPART
Andy -- shearwall; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. 1st floor seperation wall, 5/8 type X, inner layer.
BLD05-02682 BLD-Framing/Rough-in3/30/20063/31/20063/31/2006 11:44:58 AMAPART
Andy -- shearwall; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. 1st floor seperation wall. 5/8 type X inner layer.
BLD05-02681 BLD-Framing/Rough-in3/30/20063/31/20063/31/2006 11:44:11 AMAPART
Andy -- shearwall; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. 1st floor seperation wall, 5/8 type X inner portion.
BLD05-01282 BLD-Final3/30/20063/31/20063/31/2006 10:31:08 AMANR
Clint; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Still needs elec. final and needs to pull mech. permit. No ceiling grid insp. done yet.
BLD05-03501 BLD-Aging Inspection3/31/20063/31/20063/31/2006 10:17:56 AM NR
Needs elec. final.
BLD05-03500 BLD-Aging Inspection3/31/20063/31/20063/31/2006 9:47:42 AM NR
Needs elec. final.
BLD05-02275 BLD-Framing/Rough-in3/30/20063/31/20063/31/2006 9:29:18 AMAFAIL
Randy; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Complete nailing of simpsonhangars on jack trusses in garage. Justify only two 11 7/8 ML headers on overhead doors instead of three as redlined on approved plans. Justify deletion of 2X8 headers over windows in den. Provide engineering for modified G4 truss. Provide fix for cut top chord on floor joist at plumbing penetration. ok to insul. c/n posted.







BLD05-01611 BLD-Framing/Rough-in3/30/20063/31/20063/31/2006 8:48:35 AMAPASS
Max -- air seal package; prefer early AM; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Add strap to ml beam and brace gable end.