FIR08-00255
| INSP-Final Inspection | 3/27/2009 | 3/27/2009 | | P | |
|
|
Contact Rafe Phone#: ###-####
|
FIR08-00845
| FIR-Aging Inspection | 3/31/2009 | 3/31/2009 | 3/31/2009 9:33:14 PM | | NR |
|
|
Work in progress
|
BLD06-02303
| FIRE-Hydro test above ground | 3/31/2009 | 3/31/2009 | 3/31/2009 9:32:11 PM | P | PART |
|
|
Overhead hydrostatic testing for the 12th, 16th, 17th,18th and basement levels passed. NOTE: hydro test for the 14th floor failed due to 5 psi. loss at the guage. Also begin 24 hr. air testing for the 3rd and 4th floor dry systems.
|
BLD09-00074
| FIRE-Final Inspection | 3/31/2009 | 3/31/2009 | 3/31/2009 9:28:59 PM | P | NR |
|
|
Project related fire alarm, hood suppression, and fire sprinkler permit work has not been scheduled for inspection or approved for final.
|
FIR09-00118
| INSP-Final Inspection | 3/30/2009 | 3/31/2009 | 3/31/2009 9:25:57 PM | P | CANC |
|
|
Billy ###-#### NOTE: Air balance report failed per mechanical inspection.
|
FIR08-00270
| INSP-Sprinkler Rough-in/Hydro | 3/30/2009 | 3/31/2009 | 3/31/2009 9:22:54 PM | A | PART |
|
|
AG hydrostatic testing completed satisfactory.
|
FIR08-00766
| INSP-Sprinkler Rough-in | 3/31/2009 | 3/31/2009 | 3/31/2009 9:21:53 PM | A | PART |
|
|
Thrust blocking at the truck return building supply line okayed.
|