Inspections for the day of: Tuesday, March 31, 2009.
Number of inspections: 15
Percentage of inspections complete: 93 %
Percentage of inspections not complete: 7 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00745 INSP-Conference3/26/20093/27/2009 P 
Inspection follow up.
FIR08-00607 INSP-Alarm Testing3/30/20093/31/20093/31/2009 5:45:50 PMACANC
Cnceled due to time constraints
BLD08-01467 FIRE-Final Inspection3/30/20093/31/20093/31/2009 2:16:42 PMACANC
Could not perform inspection due to time constraints.
FIR09-00030 INSP-Supply line flush3/31/20093/31/20093/31/2009 2:10:37 PMPPASS
The underground flush passed.
FIR09-00030 INSP-Sprinkler Rough-in/Hydro3/31/20093/31/20093/31/2009 2:09:08 PMPPASS
The underground hydro test passed.
FIR06-00469 INSP-Final Inspection3/30/20093/31/20093/31/2009 1:47:52 PMAFAIL
There are three pendant heads blocked by obstructions. One is by a hanging light in the first floor north dining area. THe other two are too close to ceiling fans in the second floor bedrooms. Also the wrong sized water meeter was not addressed with the last resubmittals and does need to be addressed with resubmittals. The water meter currently installed is 1" in size. I spoke to Mick about these items.
BLD08-01664 FIRE-Final Inspection3/30/20093/31/20093/31/2009 1:20:03 PMAFAIL
The project related fire alarm permit needs to be finaled prior to this inspection. A preliminary inspection was previously provided.
FIR09-00130 INSP-Final Inspection3/30/20093/31/20093/31/2009 1:19:02 PMAFAIL
Need a map showing the entire system at the facp, repair the NAC trouble, test/inspect the elevator recall functions and per IFC 904.3.5 the clean agent suppression system is required to be monitored. See Monitoring.
Where a building fire alarm system is installed, automatic fire-extinguishing systems shall be monitored by the building fire alarm system in accordance with NFPA 72.
FIR08-00778 INSP-Final Inspection3/30/20093/31/20093/31/2009 1:14:37 PMAPASS
Permit finaled
FIR09-00061 INSP-Alarm Testing3/30/20093/31/20093/31/2009 9:55:21 AMACANC
Scheduled by a contractor via Hello! on 3/30/2009 at 3:21:50 PM. Contact: ###-####.
FIR09-00123 INSP-Final Inspection3/30/20093/31/20093/31/2009 9:54:52 AMAPASS
permit finaled
BLD09-00380 FIRE-Final Inspection3/30/20093/31/20093/31/2009 9:44:23 AMAFAIL
Steve French ###-#### I left a voice message on the answering machine. There was also no one on site or access into the suite.
FIR08-00824 INSP-Final Inspection3/30/20093/31/20093/31/2009 9:37:26 AMAPASS
pemit finaled
FIR09-00136 INSP-Final Inspection3/30/20093/31/20093/31/2009 9:36:32 AMAPASS
Permit finaled
BLD09-00062 FIRE-Final Inspection3/30/20093/31/20093/31/2009 8:53:28 AMACANC
Phone #: ###-#### Internet Inspection Request from: Darren Gossett Inspection cancelled from web by: Darren Gossett