Inspections for the day of: Wednesday, March 31, 2010.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00706 Conference3/31/20103/31/20104/1/2010 3:21:16 PMPFAIL
Verbal to RP:
Clean up all sediment debris off of the hard surface where vertical construction is occuring to the maximum extent practible.
Also install a sediment barrier along the West end of the irragation channel. Will re-inspect on 3/2/10PM.
ESC05-00042 DOC - Permit Expired3/31/20103/31/20103/31/2010 3:55:28 PMPPASS
ESC10-00229 Site Preparation3/31/20103/31/20103/31/2010 1:40:37 PM FAIL
Verbal to RP & Excavator:
Clean up all sediment off the hard surfaces by the end of the day and or prior to any rain event. Also install sediment barrier at the lot at bottom of the hill where staging stock piles. Once area is not in use it is a requirement to re-stabilize the the disturbed area of the lot. Will re-inspect on 4/2/10.
ESC08-00735 General Inspection3/31/20103/31/20103/31/2010 1:15:09 PM DONE
ESC08-00735 DOC - Permit Finaled3/31/20103/31/20103/31/2010 1:14:58 PMPPASS
ESC08-00706 General Inspection ESC3/31/20103/31/20103/31/2010 10:04:49 AM FAIL
Verbal to RP:
Clean up tracking at the east end of project area. Maintain storm drains. Will be having a confrence in the PM today.
ESC08-00566 DOC - Permit Finaled3/31/20103/31/20103/31/2010 9:41:29 AMPPASS
ESC08-00699 General Inspection ESC3/31/20103/31/20103/31/2010 9:30:41 AM DONE
ESC08-00699 DOC - Permit Finaled3/31/20103/31/20103/31/2010 9:30:30 AMPPASS
ESC08-00718 General Inspection ESC3/31/20103/31/20103/31/2010 9:06:00 AM FAIL
Correction Notice(left a message for owner to contact the city over notice.)

1. Provide an RP with day to day control over Erocion and Sediment control issues that can be contacted.
2. Install an approved BMP for the storm drain inlet protection.
3. Install a sediment barrier BMP at the end of the road in the project at the NOrth West end where the disturbed soil meets with the pavement.
4. Post the ESC sign where it is visable from the street withh all of the proper information.
**Failure to comply will result in further enforcement. Will re-inspect on 4/5/10PM.
ESC09-00350 Site Final3/30/20103/31/20103/31/2010 8:11:06 AMAPASS
All work has been completed that would impact the BMC 8-17. All temporary BMP are all removed.