FIR11-00110
| INSP-Final Inspection | 3/31/2011 | 3/31/2011 | 4/1/2011 2:52:55 PM | P | PASS |
|
|
Permit finaled. Inspection required two trips due to the contractors need to install shielded wire prior to final sign off.
|
FIR11-00111
| INSP-Final Inspection | 3/31/2011 | 3/31/2011 | 4/1/2011 2:25:32 PM | P | PASS |
|
|
Permit finaled. Inspection required two trips due to the contractors need to install shielded wire prior to final sign off.
|
FIR11-00130
| INSP-Sprinkler Rough-in | 3/30/2011 | 3/31/2011 | 3/31/2011 3:55:27 PM | P | PASS |
|
|
See the city approved plans for amount of piping that is ok for cover marked in red with todays date.
|
FIR05-00109
| INSP-Final Inspection | 3/30/2011 | 3/31/2011 | 3/31/2011 3:54:29 PM | A | PASS |
|
|
Permit finaled
|
BLD11-00478
| FIRE-Final Inspection | 3/30/2011 | 3/31/2011 | 3/31/2011 9:42:26 AM | A | FAIL |
|
|
Will be ok to final when the fire alarm permit for the AES panel is finaled.
|
FIR11-00147
| INSP-Final Inspection | 3/30/2011 | 3/31/2011 | 3/31/2011 9:40:55 AM | A | PASS |
|
|
permit finaled
|
FIR10-00542
| INSP-Sprinkler Rough-in/Hydro | 3/30/2011 | 3/31/2011 | 3/30/2011 2:42:39 PM | A | PASS |
|
|
hydro test passed
|