FIR14-00141
| INSP-Final Inspection | 3/31/2014 | 3/31/2014 | 3/31/2014 5:06:16 PM | P | NR |
|
|
Functional testing to be rescheduled per contractor.
|
FIR14-00124
| INSP-Sprinkler Rough-in | 3/31/2014 | 3/31/2014 | 3/31/2014 2:56:13 PM | P | PART |
|
|
Regarding possible obstructions
|
FIR14-00141
| INSP-Final Inspection | 3/28/2014 | 3/31/2014 | 3/31/2014 2:43:46 PM | A | NR |
|
|
Verified scope of work and device locations per approved plans. Functional testing incomplete due to panel difficulties.
|
BLD06-02323
| FIRE-Final Inspection | 3/28/2014 | 3/31/2014 | 3/31/2014 2:36:01 PM | A | PART |
|
|
Fire life safety for building #2 unit 202 passed inspection.
|
BLD13-02788
| FIRE-Final Inspection | 3/31/2014 | 3/31/2014 | 3/31/2014 11:47:51 AM | P | PART |
|
|
Final pending door hardware at the main entry/exit as discussed. Verified annual certification of the existing fire sprinkler system.
|
BLD14-00660
| FIRE-Conference | 3/31/2014 | 3/31/2014 | 3/31/2014 11:08:54 AM | A | DONE |
|
|
On site conference regarding project related trade work, egress lighting, fire extinguisher locations, etc.
|