FIR19-00516
| INSP-Sprinkler Rough-in | 3/30/2020 | 3/31/2020 | 4/1/2020 7:48:07 AM | P | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping installed in floor joist cavity on level 4 complete, piping located in floor joist cavity on level 4 approved for cover, a follow up cover inspection will be required for piping above lowered ceilings.
Tony Cetani is the contact. This rough-in is for the 4th floor hotel. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD19-04670
| FIRE-Final Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 12:39:41 PM | P | PASS |
|
|
No fire sprinklers, stand-alone duct detector (FIR20-00210) is complete with no other fire alarm devices, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete, signatures provided on permit sign off card.
John Phone #: ###-####
|
FIR20-00210
| INSP-Final Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 12:38:13 PM | P | PASS |
|
|
Previously noted item has been corrected, final inspection for scope of work is complete.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR19-00800
| INSP-Final Inspection | 3/30/2020 | 3/31/2020 | 3/31/2020 10:06:52 AM | P | PART |
|
|
Partial final inspection is complete, upright heads were added above T-grid by electrical room attached to room at end of hallway 203, n ceiling in electrical room and wall does not go all of the way to the deck. Drawings need to show addition of upright heads that were added to be compliant with 2016 NFPA13, section 8.15.23, permit will not be finaled until drawings are updated with changes made.
Cole Bierman is the contact and has asked to be notified 1 hr ahead of time. Thanks(: Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR20-00111
| INSP-Sprinkler Rough-in/Hydro | 3/30/2020 | 3/31/2020 | 3/31/2020 10:02:27 AM | A | DONE |
|
|
Hydrostatic test for new heads/whips installed on the isolated piping has been witnessed, no pressure loss observed.
Austin Farnworth is the contact for this overhead Hydro. He is requesting a hydro on 2nd Floor of Phase 1. We appreciate your help with this inspection. Thanks for helping us with the confusion. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD19-02971
| FIRE-Final Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 8:39:51 AM | P | CANC |
|
|
Permit does not require a life safety signature, this request is cancelled.
call for access // Luke Phone #: ###-####
|
BLD19-04789
| FIRE-Final Inspection | 3/23/2020 | 3/31/2020 | 3/31/2020 8:38:34 AM | A | PASS |
|
|
Previously noted item has been corrected, final life fire safety inspection is complete, signature provided on permit sign off card.
William Phone #: ###-####
|
FIR20-00016
| INSP-Sprinkler Rough-in/Hydro | 3/30/2020 | 3/31/2020 | 3/30/2020 3:32:28 PM | A | CANC |
|
|
Austin Farnworth is the contact for this Overhead Hydro Inspection. We appreciate your help. Thank you. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
FIR20-00216
| INSP-Sprinkler Rough-in/Hydro | 3/30/2020 | 3/31/2020 | 3/30/2020 2:32:37 PM | A | CANC |
|
|
Austin Farnworth is the contact for this Overhead Hydro Inspection. We appreciate your help with this. Thank you! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|