PLM96-00373
| INSP - Plumbing Rough-in | 3/1/1996 | 3/4/1996 | 3/4/1996 12:00:00 AM | A | PASS |
|
|
03/04/96 334 - READY MON AT 10:00....9 FIXTURES
|
PLM96-00385
| INSP - Plumbing Rough-in | 3/4/1996 | 3/4/1996 | 3/4/1996 12:00:00 AM | P | PASS |
|
|
2nd floor 1 w/c 1 lav
|
PLM4046911
| INSP - Final | 3/4/1996 | 3/4/1996 | 3/4/1996 12:00:00 AM | P | PASS |
|
|
03/04/96 334 -
|
PLM96-00151
| INSP - Plumbing Rough-in | 3/4/1996 | 3/4/1996 | 3/4/1996 12:00:00 AM | P | PASS |
|
|
03/04/96 334 - REINSPECTION
|