Inspections for the day of: Monday, March 4, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-00492 Water and/or Sewer3/1/20023/4/20023/4/2002 12:00:00 AMAPASS
Scheduled by Inspector: 330 On 3/1/2002 11:10:08 AM
PLM01-03516 Groundwork3/1/20023/4/20023/4/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/01/2002 at 15:51:35. Contact: ###-####. looks like a t.i. to me but I didn't have access to the approved plans. I left a mesage on sawtooth const. phone to call me and verify the scope of work. 3/4/2002 11:16:27 AM
PLM01-03729 Water and/or Sewer3/1/20023/4/20023/4/2002 12:00:00 AMAFAIL
Scheduled by Inspector: 330 On 3/1/2002 4:33:47 PM more trouble with the test gear 3/4/2002 5:09:02 PM
PLM01-02578 Final3/3/20023/4/20023/4/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/03/2002 at 14:47:16. Contact: ###-####. final ok 3/4/2002 11:45:47 AM
PLM02-00470 Plumbing Rough-in3/4/20023/4/20023/4/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/04/2002 at 08:48:47. Contact: ###-####.
PLM02-00469 Plumbing Rough-in3/4/20023/4/20023/4/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/04/2002 at 08:49:41. Contact: ###-####.
PLM02-00343 Groundwork3/4/20023/4/20023/4/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/04/2002 at 09:13:30. Contact: ###-####. 9x10 from sump to loading dock test ok. 3/4/2002 3:07:53 PM
PLM02-00479 Plumbing Rough-in3/4/20023/4/20023/4/2002 12:00:00 AMPCANC
###-#### MIKE
PLM02-00469 Plumbing Rough-in3/4/20023/4/20023/4/2002 12:00:00 AMPNR
Added by Inspector: 330 On 3/4/2002 2:04:43 PM test equipment failure
PLM02-00470 Plumbing Rough-in3/4/20023/4/20023/4/2002 12:00:00 AMPNR
Added by Inspector: 330 On 3/4/2002 2:04:20 PM test equipment failure