PLM02-00492
| Water and/or Sewer | 3/1/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 330 On 3/1/2002 11:10:08 AM
|
PLM01-03516
| Groundwork | 3/1/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 15:51:35. Contact: ###-####. looks like a t.i. to me but I didn't have access to the approved plans. I left a mesage on sawtooth const. phone to call me and verify the scope of work. 3/4/2002 11:16:27 AM
|
PLM01-03729
| Water and/or Sewer | 3/1/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 330 On 3/1/2002 4:33:47 PM more trouble with the test gear 3/4/2002 5:09:02 PM
|
PLM01-02578
| Final | 3/3/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/03/2002 at 14:47:16. Contact: ###-####. final ok 3/4/2002 11:45:47 AM
|
PLM02-00470
| Plumbing Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 08:48:47. Contact: ###-####.
|
PLM02-00469
| Plumbing Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 08:49:41. Contact: ###-####.
|
PLM02-00343
| Groundwork | 3/4/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 09:13:30. Contact: ###-####. 9x10 from sump to loading dock test ok. 3/4/2002 3:07:53 PM
|
PLM02-00479
| Plumbing Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | P | CANC |
|
|
###-#### MIKE
|
PLM02-00469
| Plumbing Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | P | NR |
|
|
Added by Inspector: 330 On 3/4/2002 2:04:43 PM test equipment failure
|
PLM02-00470
| Plumbing Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | P | NR |
|
|
Added by Inspector: 330 On 3/4/2002 2:04:20 PM test equipment failure
|