Inspections for the day of: Monday, March 4, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00609 Pressure Test3/1/20023/4/20023/4/2002 12:00:00 AMAPASS
###-#### joe
MEC02-00625 Rough-in3/1/20023/4/20023/4/2002 12:00:00 AMAFAIL
greg ###-####
MEC02-00625 Pressure Test3/1/20023/4/20023/4/2002 12:00:00 AMAPASS
air care
MEC02-00226 Final3/1/20023/4/20023/4/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/01/2002 at 16:06:10. Contact: ###-####.Unable to access crawl hole, due to this area being used to store bathroom fixtures. 3/4/2002 11:33:39 AM
MEC02-00608 Rough-in2/28/20023/4/20023/4/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 02/28/2002 at 16:40:30. Contact: ###-####.c/n posted. 3/4/2002 10:39:14 AM
MEC02-00608 Pressure Test2/28/20023/4/20023/4/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 02/28/2002 at 16:41:09. Contact: ###-####.
BLD01-02802 BLD-Framing/Rough-in3/1/20023/4/20023/4/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/01/2002 at 11:07:14. Contact: ###-####.c/n posted. 3/4/2002 3:30:21 PM
BLD02-00079 BLD-Framing/Rough-in3/4/20023/4/20023/4/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/04/2002 at 07:46:25. Contact: .c/n posted. 3/4/2002 2:42:47 PM
BLD01-02367 BLD-Final3/4/20023/4/20023/4/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/04/2002 at 07:48:26. Contact: .c/n landings. 3/4/2002 2:54:37 PM
MIS02-00038 BLD-Final3/4/20023/4/20023/4/2002 12:00:00 AMPPART
###-#### Dale call for access. ok to continue I have talked with the contractor. Some damage done to trusses idaho truss is going to make repairs. 3/4/2002 5:24:13 PM ho 3/4/2002 5:24:15 PM 3/4/2002 5:24:37 PM
BLD02-00051 BLD-Framing/Rough-in3/4/20023/4/20023/4/2002 12:00:00 AMPFAIL
fr gary ###-#### C/n posted. 3/4/2002 3:47:06 PM
BLD01-02536 BLD-Framing/Rough-in3/4/20023/4/20023/4/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/04/2002 at 11:23:12. Contact: ###-####.C/n nail areas at locations of shear ,marked on walls with black ink,also need ok for sthd 14's to be replaved by hphd 5's, also a short 40 in shear panel on grid line 2 need ok as separation is not the required distance due to location not in corner at the end. 3/4/2002 1:51:54 PM
BLD01-02802 BLD-Framing/Rough-in3/4/20023/4/20023/4/2002 12:00:00 AMPPART
Scheduled by Inspector: 407 On 3/4/2002 5:01:00 PM Rest room walls ok , a framed ceiling will be added after sheetrocking walls. 3/4/2002 5:25:25 PM