MEC02-00555
| Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 06:39:42. Contact: ###-####.
|
MEC02-00555
| Pressure Test | 3/4/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 06:40:20. Contact: ###-####.
|
BLD01-03163
| BLD-Framing/Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | P | NR |
|
|
center wall insp for duplexes justin ###-#### per 340 3/4/2002 1:39:06 PM
|
BLD01-03006
| BLD-Framing/Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | P | PART |
|
|
###-#### ALAN corridor pents ok, landing still in complete 3/4/2002 2:02:48 PM
|
BLD02-00035
| BLD-Conference | 3/4/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | P | PART |
|
|
for conf- ###-####- kevin needs mec check to show compliance to bcec with gas fireplace for heating req 3/4/2002 4:21:33 PM
|
BLD01-03156
| BLD-Framing/Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | P | PASS |
|
|
###-#### ROB 1st floor ok for cover 3/4/2002 2:29:27 PM
|
BLD01-01403
| BLD-Framing/Rough-in | 3/3/2002 | 3/4/2002 | 3/4/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/03/2002 at 20:10:18. Contact: ###-####. fire rated deck installed ok to vover canopy 3/4/2002 2:50:03 PM
|